Date : xxx
Ref : xxx
To : M/s. xxx GROUP, PO Box xxx, Sharjah UAE.
Project : 2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai
| Subject | : | To fix the floor tile in first floor corridor outside of All Day Dining |
Dear Mr.xxx,
With reference to the above, we have issued variation work to fix the tile/ continue from All Day Dining area to consider/passage.
Related posts:
Serious Concerned Over Failure of Fixing Doors at (2022-02)
Balance Work at 14 Th Floor and Three Nos of Door not Fixed
So, up to how you didn’t execute the scope and variation instruction issued to you by client long before.
Kindly do needful as soon as possible and acknowledge the same.
Regards,
For xxx Contracting L.L.C
xxx
Project Manager