To fix the floor tile in first floor corridor outside of All Day Dining

To fix the floor tile in first floor corridor outside of All Day Dining

Date                : xxx

Ref                   : xxx

To                    : M/s. xxx GROUP, PO Box xxx, Sharjah UAE.

Project             : 2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai

Subject:To fix the floor tile in first floor corridor outside of All Day Dining

Dear Mr.xxx,

With reference to the above, we have issued variation work to fix the tile/ continue from All Day Dining area to consider/passage.

So, up to how you didn’t execute the scope and variation instruction issued to you by client long before.

 Kindly do needful as soon as possible and acknowledge the same.

Regards,
For xxx Contracting L.L.C  

xxx

Project Manager

Leave a Reply

Your email address will not be published. Required fields are marked *