Master the Time Impact Analysis (TIA)

Master the Time Impact Analysis (TIA): Step-by-Step Delay Claim Guide

Master the Time Impact Analysis (TIA): A Step-by-Step Construction Delay Guide The Time Impact Analysis (TIA)—also known as the Time Impacted Window Analysis—is widely considered the gold standard prospective methodology for analyzing delay claims in CPM (Critical Path Method) construction scheduling. Standardized by AACE International (Method Implementation Protocol 3.7 in RP 29R-03) and the Society […]

Master the Time Impact Analysis (TIA): Step-by-Step Delay Claim Guide Read Post »

Non-Excusable Delays in Construction Projects

Rejection of Notice of Delay sent by the main Contractor

Our Ref: xxx 14 July xxx To:                             xxx P. O. Box xxx 1st Floor, xxx xxx Attention:              xxx (Project Manager) Project:                    xxx Sub-Contract:        xxx Subject:                   Rejection of Notice of Delay References:           a) The Subcontractor letter ref. xxx                                     b) The Subcontractor letter ref. xxx Dear Sir, In reference to the Sub-Contract Agreement (Ref.

Rejection of Notice of Delay sent by the main Contractor Read Post »