Showing 1–16 of 37 results
-
Sale!
CEMP & Environmental Risk Assessment Editable MS Word Format
4,00 $Purpose: The purpose of this to define a consistent and uniform approach for implementing the…
-
Sale!
Construction Programme or Baseline Programme (.xer file) for a GF + 4 Floors + Lower Roof Residential Building.
16,00 $This package includes following: Construction Programme or Baseline Programme in xer file format. Project Duration:…
-
Sale!
Construction Programme or Baseline Programme (.xer file) for a 2B + GF + 14 Floors + Lower Roof Hotel Building.
16,00 $This package includes following: Construction Programme or Baseline Programme in xer and PDF file format.…
-
Sale!
CONSTRUCTION WASTE MANAGEMENT PLAN EDITABLE MS WORD FORMAT
4,00 $Purpose: The purpose of the waste Management plan to make sure that the proper waste…
-
Sale!
Dubai Municipality Accreditation Exam Preparation Note.
8,00 $Dubai Municipality Accreditation Exam Preparation Note for G+1, G+4, G+12 and Unlimited Floor. This Question and…
-
Sale!
Extension of time claims and computation of prolongation cost for construction project. Time impacted delay analysis for a Construction project. Editable MS Word, Excel and .xer files
15,00 $Extension of time claims and computation of prolongation cost to complete the construction project with…
-
Sale!
FIRE AND EMERGENCY EVACUATION PROCEDURE EDITABLE MS WORD FORMAT
3,00 $INTRODUCTION The purpose of this Plan is to set down the format for recording the…
-
Sale!
GENERAL METHOD STATEMENT FOR A CONSTRUCTION PROJECT EDITABLE MS FORMAT
4,00 $1. Introduction Covering an approximate gross floor area of 3119.73 m² on plot no xxx…
-
Sale!
GENERAL CONSTRUCTION ACTIVITES RISK ASSESSMENT REGISTER EDITABLE MS WORD FORMAT
5,00 $GENERAL CONSTRUCTION ACTIVITES RISK ASSESSMENT REGISTER EDITABLE MS WORD FORMAT
-
Sale!
HEALTH AND SAFETY TRANING PLAN EDITABLE MS WORD FORMAT
3,00 $Purpose: The purpose of Health and safety training plan is familiarization of all relevant activities…
-
Sale!
HSE PLAN EDITABLE MS WORD FORMAT
4,00 $OBJECTIVES The principal objectives of this plan are: - To ensure a primary framework…
-
Sale!
Impacted As Planned delay Analysis methodology to claim extension of time to complete a Construction project. Editable MS Word, Excel and .xer files
15,00 $This delay analysis documents package includes following Narration of delay analysis technique and delay events…
-
Sale!
LIFTING OPERATION PLAN EDITABLE MS WORD FORMAT
4,00 $1.0 INTRODUCTION This Lifting Operations Plan details the project specific organization and arrangements for the…
-
Sale!
LIFTING RISK ASSESMENT EDITABLE MS WORD FORMAT
2,00 $Site Specific HSE Planned safety procedures are to be followed at all Minimum PPE to…
-
Sale!
LOGISTIC AND TRAFFIC MANAGEMENT PLAN EDITABLE MS WORD FORMAT
4,00 $INTRODUCTION This Logistic and Traffic Management Plan is part of Contractor’s EHS Management System for…
-
Sale!
METHOD OF RECTIFICATION OF JOINERY WORKS EDITABLE MS WORD FORMAT
5,00 $METHOD OF RECTIFICATION Introduction The content is explaining the following: 1 – Types of damages…