Work order for Mineral wool panel with Al foil faced insulation (Rockwool)

Work order for Mineral wool panel with Al foil faced insulation (Rockwool)

Date: xxx

CC/269/CI/06

Kind Attn:   The Manager, xxx Interior Division          

Project:       2B + G + 14 + Lower Roof Hotel Building

Plot No.       373-1297 at Barsha, Dubai

Subject:       Work order for Mineral wool panel with Al foil faced insulation (Rockwool)

Dear xxx,

With ref. to above, please note the following,

  1. Scope of work:
  1. Rockwool panel  with aluminum foil faced  insulation, installation from Fujairah rockwool  – density= 45kg/m3 50mm thickness as per MR attached
  2. Rockwool panel to be fixed with PVC accessories and cap.
  3. GI grid to be prepared as per the section details attached
  4. The 12.5mm Gypsum board to be fixed on the grid next to rockwool with contact in perfect level

       Area: 300sqm

Location: Basement-01

  • Cost:

 As per interdivision and company policy

  • Schedule for execution :

Immediately and to be fixed within a week (Start and finish within 7 days)

  • Contact details for clarification:

 Mr.Ramlal Pareek- 0554714645

  • General Notes:
  1. All materials to be delivered along with DO and specification details and inspection to be carried out prior to fixing by QA/QC Engineer – Alma and Consultant
  2. Safety induction to be carried out and workers must have PPE

Regards,

For xxx Contracting L.L.C

xxx

General Manager