To: xxx (QA/QC Engineer)
Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai
Subject: Performance of Engineer xxx (QA/QC Engineer)
Dear xxx,
You have been kept absent today as the inspection for the installation of PT materials at 2nd floor PT slab was rejected due to poor quality, since you are responsible for the quality of the slab and also for leaving site without any intimation to me.
Regards,
For xxx Contracting L.L.C
xxx
General Manager