Subject : Confirmation on Mass Production as per Approvals dated xxx
Dear Eng. xxx,
This is to place on record that xxx are proceeding with the production of the pods based on the approvals received on xxx Shop drawings / the Mock up and the Material Submittals.
If there are any further changes to the approved drawings, it should be informed officially within two working days from this letter.
Attached along with this letter are the following:
- Mock up approvals and xxx comment resolution sheet.
- Shop drawing Submittal log (Approved with “B” Status).
- Access Panel Location received from Mr. xxx Dated xxx (Attached Copy of the email for future reference).
- Updated Material Submittal Log for all the materials used in the pods.
Pending Documents yet to be received from KCC (Already approved by the client & Consultant)
- Pending approval copies to be forwarded to xxx by xxx,
- Floor Drain Cover
- Vanity Cabinets
- Floor, Wall & Shower area Tiles
- Vanity Top and Cistern Top
- Toilet Cistern Tank & Chrome Flush Plate
- Down Light
- Shower Drain
- Corner Sponge Holder
- Rob Hook
- Shower Enclosure
- Cost variation approved Document for the Additional Down lights.
- Cost variation approved document for the SS 316 Shower Drain Cover.
Yours faithfully,