xxx mail for delivery of Tiles and cheque copy. - Construction Template

Handing Over of Documents

Ref: xxx

Date: xxx

To,

xxx

Dubai, UAE

Kind Attn         : xxx

Project             : Plot No. xxx, Al Barsha, Dubai, UAE.

Contarctor       : xxx Contracting LLC

Client               : xxx

Subject            : HANDING OVER OF DOCUMENTS

Dear Sir,

With reference to the above we are submitting the following documents, kindly acknowledge and received.

Related posts:
Regarding Additional Documents Handing Over
Regarding the Issue of New Building Permit

  1. The complete compaction result for entire basement issued by Universal Soil Testing Lab, page 1/13 to 13/13.
  2. The level confirmation report at formation level issued by Superior Geotechnical EST, page 1/1.
  3. Soil investigation report issued by Superior Geotechnical EST, page 1/44 to 44/44.
  4. Lift contract documents as required and file submitted, page 1/16 to 16/16.
  5. Drainage & Irrigation NOC along with dewatering NOC as required, page 1/18 to 18/18.
  6. DM Charges for FIC/Drainage Connection, Ref: NEB-S-06-622/0849, NOC No. NOC-08112007-0051, page 1/2 to 2/2.
  7. Shoring drawing, page 1/22 to 22/22.
  8. DEWA- load schedule and Electrical drawing (submitted to DEWA), page 1/62 to 62/62.
  9. Building Permit no. 135591-21-1 for architectural drawing, page 1/26 to 26/26.
  10. Columns and Foundation Strengthening/Jacketing document, page 1/74 to 74/74.

Regards,

For xxxx Contracting L.L.C.

xxxx

Project Manager