Ref: xxx
Date: xxx
To,
xxx
Dubai, UAE
Kind Attn : xxx
Project : Plot No. xxx, Al Barsha, Dubai, UAE.
Contarctor : xxx Contracting LLC
Client : xxx
Subject : HANDING OVER OF DOCUMENTS
Dear Sir,
With reference to the above we are submitting the following documents, kindly acknowledge and received.
- The complete compaction result for entire basement issued by Universal Soil Testing Lab, page 1/13 to 13/13.
- The level confirmation report at formation level issued by Superior Geotechnical EST, page 1/1.
- Soil investigation report issued by Superior Geotechnical EST, page 1/44 to 44/44.
- Lift contract documents as required and file submitted, page 1/16 to 16/16.
- Drainage & Irrigation NOC along with dewatering NOC as required, page 1/18 to 18/18.
- DM Charges for FIC/Drainage Connection, Ref: NEB-S-06-622/0849, NOC No. NOC-08112007-0051, page 1/2 to 2/2.
- Shoring drawing, page 1/22 to 22/22.
- DEWA- load schedule and Electrical drawing (submitted to DEWA), page 1/62 to 62/62.
- Building Permit no. 135591-21-1 for architectural drawing, page 1/26 to 26/26.
- Columns and Foundation Strengthening/Jacketing document, page 1/74 to 74/74.
Regards,
For xxxx Contracting L.L.C.
xxxx
Project Manager