Date: xxx
Ref: xxx
Kind Attn :Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai
Subject : Confirmation to use design/approved aluminium section GL-01 (Front Elevation) as per shop drawing and undertaking for any issue with authority for final demarcation.
Dear Sir,
With reference to above, we are hereby confirming, after checking with our Land Surveyor, that our subcontractor METALU can use the approved section (GL-01) under our responsibility for additional projection from the plot limit. So, the subcontractor can proceed with work as approved shop drawing under our confirmation for any issue for the plot limit or project approval from authority.
Related posts:
Client Instruction to Cut the Skirting from the Tile
Electrical Component Requirement in the Lift and Their Quotation
Regards,
For xxx Contracting L.L.C.
xxx
Project Manager