Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance Dear Mr. […]

Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance Read Post »

core cutting

Provide required detail/drawing for requirement of core cutting for cable

                       Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Provide required detail/drawing for requirement of core cutting for cable                           and approval from xxx Dear Mr. Mayur and Mr. Ramesh, With reference to

Provide required detail/drawing for requirement of core cutting for cable Read Post »

Tower Crane

Removal of your heavy materials as we will be removing tower crane

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Removal of your heavy materials as we will be removing tower crane on                           Dear Mr. Mayur and Mr. Ramesh, This is to inform

Removal of your heavy materials as we will be removing tower crane Read Post »

Contract Documents

Collection of Signed Contract Document from us One (1) no. Elevator (SL 1) for construction activity

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Collection of Signed Contract Document to us One (1) no. Elevator (SL 1)                             for construction activity Dear Mr. Mayur and Mr. Ramesh, We are

Collection of Signed Contract Document from us One (1) no. Elevator (SL 1) for construction activity Read Post »

Lift

Quotation for supply and installation of cable for CCTV & WIFI in all three lifts

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject             : Regarding to provide the quotation for the supply and installation of                            cable for CCTV & WIFI in all three lifts. Dear Mr. Ramesh &

Quotation for supply and installation of cable for CCTV & WIFI in all three lifts Read Post »

dumbwaiter-lift

Regarding Dumb Waiter Co-ordination and Handing Over

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject             : Regarding Dumb Waiter Co-ordination and Handing Over Dear Sir, With reference to the above mentioned subject, we have given you numerous calls for the dumb

Regarding Dumb Waiter Co-ordination and Handing Over Read Post »

Scaffolding

For lift shaft scaffolding and our concern for the access ladder

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject         :    For lift scaffolding and our concern for the access ladder your Ref                             No.NI16 026-SC-NI-CMX-BARSHA-013 Dated 29.11.2017. Dear Sir,  With ref to above we would

For lift shaft scaffolding and our concern for the access ladder Read Post »

Lift

Regarding the requirement of the beam in lift no.02 in your drawing and Issue of the design and calculation

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Regarding the requirement of the beam in lift no.02 in your drawing and                         Issue of the design and calculation. Dear Sir, With reference to

Regarding the requirement of the beam in lift no.02 in your drawing and Issue of the design and calculation Read Post »

Understand the given instructions

Eliminate the comments on shop drawing

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject           : Eliminate the comments on shop drawing Dear Sir, With ref to above, as we returned the lift drawing which is commented by consultant ,there are

Eliminate the comments on shop drawing Read Post »