Date: XXX
CC/SCHINDLER/002
To : M/s XXX Intl.Ltd
Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai
Subject : Regarding to provide the quotation for the supply and installation of
cable for CCTV & WIFI in all three lifts.
Dear Mr. Ramesh & Mr. Mayur,
With reference to the above subject, we are hereby attaching the communication from consultant & client with reference no of consultant AP/269/CC/514 on dated 25th jan 2018 and client reference no CM/AP/0267/18 on dated 15th jan 2018 as per the scope mention in attached document are self-explanatory.
So, kindly provide the quotation for the Supply and installation of elevator travelling cable for CCTV & WIFI, as soon as possible without any further delay.
This is for your kind information and to do needful immediately within 2 days.
Related posts:
Collection of Signed Contract Document from Us One (1) No. Elevator (sl 1) for Construction Activity
Removal of Your Heavy Materials as We will be Removing Tower Crane
Related posts:
Collection of Signed Contract Document from Us One (1) No. Elevator (sl 1) for Construction Activity
Removal of Your Heavy Materials as We will be Removing Tower Crane
Regards,
For XXX Contracting L.L.C
XXX
General Manager



