Issue of non-availability of Labour

Date: xxx CC/HR/003 Kind Attn:       HR Department Project:         2B + G + 14 + Lower Roof Hotel Building Plot No.:        373-1297 at Barsha, Dubai Subject:       Issue of non-availability of Labour Dear HR, With ref. to above, the Labour who has worked at Citymax site yesterday dt.13.07.16 till 11 PM are supposed to be coming to work at site today […]

Issue of Mr.xxx and his settlement

Date: xxx CC/HR/002 Kind Attn:         HR and Accounts department Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Issue of Mr.Dilip Saigal and his settlement Dear Mr.Vinod Arora and Mr.Vasu Dev Mehtan, With ref. to above Mr.xxx who was PM at site during casting of the 1st Slab signed the […]

Claim to deduct amount from machinery supplier

Date: 21.02.17 CMSite/PURCHASE/001 Kind Attn:        Mr.xxx Subject:            Claim to deduct amount from machinery supplier Dear Sir, With reference to the above mentioned subject, as you know that, while casting the concrete every time ,we need compressor for cleaning the pipe of placing boom . But on dated 13.02.17, the compressor was not working properly then we requested to send other […]

Our observation on the tiles delivered at the site and awaited for your response

Date: 12.10.16 Ref:   CC/269/EVT/01 To:                   The Manager, xxx General Trading LLC Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, and U.A.E Subject:           Our observation on the tiles delivered at the site and awaited for your response Dear Sir, With ref. to above, as per our previous communication we are […]

Regarding requirement of Contract Agreement for Chillers

Date: xxx           Ref:     CC/269/JC/01 To:                   M/s. Johnson Controls Kind Attn:       Mr. xxx Azad Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:     Regarding requirement of Contract Agreement for Chillers Dear Sir, With ref. to above, as you are the nominated contractor by our client we request you […]

Client instruction to contact you for quotation to resize/ cutting the toilet wall tile due to size issue in the supply.

Date: xxx CC/HARJ /001/17 To:                   M/s. xxx Bldg. Mat & Marbles TR. Project:               2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject:           Regarding client instruction to contact you for quotation to resize/ cutting the toilet wall tile due to size issue in the supply. Dear Mr. Saheer, With reference above, […]

Performance of Engineer xxx (QA/QC Engineer)

To:                  xxx (QA/QC Engineer) Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject:          Performance of Engineer xxx (QA/QC Engineer) Dear xxx, You have been kept absent today as the inspection for the installation of PT materials at 2nd floor PT slab was rejected due to poor quality, since you […]

Guide line for surveyor work

Date: xxx CC/SITE/07/16 Kind Attn:          Land surveyor Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Guide line for surveyor work Dear Surveyor, Kindly note the following: Surveyor must report at the site to PM –Mr. xxx where all the level of points are to marked for that will be […]

Micro level detailing of Structural drawings

Date: xxx CC/SITE/06/16 Kind Attn:         xxx Rai Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:           373-1297 at Barsha, Dubai Subject:          Micro level detailing of Structural drawings Dear Foreman, Regarding block work and Block status, inspection is done without chipping. Toilet D2 sub frame is not fixing in Basement 02 ( there is mistake in […]

Micro level detailing of Structural drawings

Kind Attn:        Ms.xxx Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:           373-1297 at Barsha, Dubai Subject:          Micro level detailing of Structural drawings Dear Manisha, You have to prepare micro level detailing of structural drawings of the following: All structural drawings details related to column, core wall and slab for all Floors from 4th Floor level. […]