Background Music System Shop Drawing

Date:               xxx

Ref:                  xxx

Kind Attn         :Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai

Subject      : Requirement for background music system  to prepare the shop drawing by sub contractor.

Dear Sir,

   With reference to above we held the meeting with background music system subcontractor M/s Al xxx Technologies on dated xxx and they required the some information which are attach herewith the Minutes of Meeting No 1.

    So, kindly review the attachment M.O.M No 1 and provide the required information and note that the shop drawing will be submitted after your replay for the requirement.

Related posts:
Submission of Substitute Chemical for Foam Concrete and Undertaking for Density
Approval of the 60×60 False Ceiling Sample

Regards,

For xxx Contracting L.L.C.

xxx

Project Manager