Ref. : XX/1007/AGC/2021/41 Date: February 06, 2021 To : M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: +XXX Attention: Mr. XXX – Resident Engineer Project: Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject: Issue with Wooden and Joinery works subcontractor. Dear Sir, With reference to aforementioned… Continue reading Issue with Wooden and Joinery works subcontractor
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Notification of Variation for Tile Chamfering and Polishing.
Date: October 7, 2021 Ref.: XXX/1007/AGC/43/2021 Total Pages: 1 To, M/s. M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX, Fax: +XXX Attention: Mr. XXX – Resident Engineer Project: Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, XXX, Dubai. Subject: Notification of Variation for Tile Chamfering and Polishing. Dear Sir, With reference… Continue reading Notification of Variation for Tile Chamfering and Polishing.
Method of Statement of Waterproofing Repair System for leakages in basement swimming pool
Update of lift nominated sub-contractor Schindler Pars Intl Ltd
Date: xxx Ref: CC/AP/118/16 To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject: Regarding update of lift nominated sub-contractor and update for follow up with Schindler Pars Intl Ltd Dear Sir, With… Continue reading Update of lift nominated sub-contractor Schindler Pars Intl Ltd
METHOD STATEMENT FOR PLANTED COLUMNS
INTRODUCTION:- The project is Consist “Proposed B+G+1 Villa on Plot No. xxx at Jumeirah First, Dubai for “Mr. xxx” THE METHOD FOR PLANTED COLUMNS IS AS FOLLOWS: – Firstly, the Planted Columns will be marked by hiring of a specialize survey company M/s. Middle East Survey Engineering LLC. Upon marking of all Planted Columns over… Continue reading METHOD STATEMENT FOR PLANTED COLUMNS
Method of Statement of False Ceiling/Suspended ceiling works
Introduction Scope & Objective. Equipment’s & Tools/ Manpower/ Materials. How work is being Started. Setting Out. Ceiling suspension. Inspection/ Clearance. Joint Compound, Joint Taping Work. AC Grill, Light Cutting & Access Panel Fixing. Contact Us. Introduction –What is a false ceiling?A false ceiling or alternatively called drop ceiling is a fixed framework made of either… Continue reading Method of Statement of False Ceiling/Suspended ceiling works
METHOD STATEMENT FOR FLOOR EPOXY SCREEDING & COATING WORKS
SURFACE PREPARATION Prepare the surface by grinding. After the grinding, clean the surface with vacuum cleaner. The substrate should be sound wrt – no loose or crumbling concrete; no unbounded cement particles; no previously applied toppings, sealers or paints. Care must be taken that the temperature of the floor and the ambient temperature should be… Continue reading METHOD STATEMENT FOR FLOOR EPOXY SCREEDING & COATING WORKS
Method of Statement of Tiles Installation works
1.0 OBJECTIVEThis method statement describes a work explanation of the methods and procedure to be carried out for tiles installation works for Construction of B+G+1 FOR MR. XXX in Dubai to ensure that during the entire execution stage, the work is done in line with good engineering practices and in compliance with engineering standard practices,… Continue reading Method of Statement of Tiles Installation works
Method of Statement of GRP Lining Works
Method of WorkingAl Marwa Fiber Glass Factory required these steps for Surface Preparation, before start thework. These steps must be done by Contractor/Owner.GRINDING:After concreting many irregularities on the surface remain and if lamination iscarried out on such surface finishing on the outer surface will be inferior. Hence, surfacegrinding of concrete has to be done, if… Continue reading Method of Statement of GRP Lining Works
Non acceptance of the claim and we have our right to counter claim
Date : xxx Ref No : CC/HC/019 To : M/s xx Center Attn. : Mr. xxx Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject : Non acceptance of the claim and we have our right to counter claim Dear Mr.xxx, With reference to… Continue reading Non acceptance of the claim and we have our right to counter claim