Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project: 2B+G+14+Lower Roof xxx Hotel Building Plot No. : xxx Location: Al Barsha 1st, Dubai, UAE Client: xxx Consultant: … Continue reading Request for permit to place minor road diversion to place concrete pump in front of the plot
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Regarding renewal of Permit for Building construction or Demolition
Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project: 2B+G+14+Lower Roof xxx Hotel Building Plot No. : xxx Location: Al Barsha 1st, Dubai, UAE Client: xxx Consultant: … Continue reading Regarding renewal of Permit for Building construction or Demolition
No Objection from xxx Contracting LLC (Main Contractor to release the shoring contracting deposits with RTA)
Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project: 2B+G+14+Lower Roof xxx Hotel Building Plot No. : xxx Location: Al Barsha 1st, Dubai, UAE Client: xxx Consultant: … Continue reading No Objection from xxx Contracting LLC (Main Contractor to release the shoring contracting deposits with RTA)
Request for permit to place minor road diversion to place concrete pump in front of the plot
Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project: 2B+G+14+Lower Roof xxx Hotel Building Plot No. : xxx Location: Al Barsha 1st, Dubai, UAE Client: xxx Consultant: … Continue reading Request for permit to place minor road diversion to place concrete pump in front of the plot
Requirement of Anti Carbonated Paint System details for tomorrow’s meeting
Date: xxx Ref. xxx To: Project: 2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject: Requirement of Anti Carbonated Paint System details for tomorrow’s meeting Dear Sir, With ref. to above, there is meeting held tomorrow dt.25.07.16 at 2:00PM where you have to bring… Continue reading Requirement of Anti Carbonated Paint System details for tomorrow’s meeting
Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal
Date: xxx Ref. xxx To: Project: 2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject: Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal. Dear Sir, With ref. to above our painting proposal which is submitted on 18.4.16… Continue reading Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal
previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached)
Date: xxx Ref. xxx To : xxx Building material Supply Tel-xxx Kind Attn : The Manager Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject: previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached) Dear Sir,… Continue reading previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached)
Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project
Date: xxx Ref. xxx To : xxx Building material Supply Tel-xxx Kind Attn : The Manager Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject: Verbal intimation by client that you are nomination to supply that balance item from our list attached for… Continue reading Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project
Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues
Date:xxx Ref No. xxx To : M/s xxx Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Dear Sir, With reference to… Continue reading Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues
To provide CCTV approved drawing from authority to remove the special condition from the original permit prior to BCC
Date: xxx Ref. xxx To : M/s. xxx Communication DMCC Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai, U.A.E. Client : Mr. xxx Subject : To provide CCTV approved drawing from authority to remove the special condition from the… Continue reading To provide CCTV approved drawing from authority to remove the special condition from the original permit prior to BCC