material delivery Date: xxx Ref. xxx To : M/s. xxx Communication DMCC Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai, U.A.E. Client : Mr. xxx Subject : Regarding your submission of current invoice and to claim of material… Continue reading Submission of current invoice and to claim of material at site
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Regarding your submittal ref : Vox/CMAL Barsha/02.01.xxx
Date: xxx Ref. xxx To : M/s. xxx Communication DMCC Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai, U.A.E. Client : Mr. xxx Subject :Regarding your submittal ref : Vox/CMAL Barsha/02.01.2018 Dear Sir, With reference to above we receive… Continue reading Regarding your submittal ref : Vox/CMAL Barsha/02.01.xxx
Your verbal intimation that your specification being changed by the client and provide feed back for drawing submission and signing the terms and condition
Date: xxx Ref. xxx To : M/s. xxx Communication DMCC Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai, U.A.E. Client : Mr. xxx Subject :Your verbal intimation that your specification being changed by the client and provide feed back… Continue reading Your verbal intimation that your specification being changed by the client and provide feed back for drawing submission and signing the terms and condition
your intimation on telephonic conversation that client is revising the scope/specification and delay to signing the Terms & Conditions as well as shop drawing
Date: xxx Ref. xxx To : M/s. xxx Communication DMCC Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai, U.A.E. Client : Mr. xxx Subject :Regarding your intimation on telephonic conversation that client is revising the scope/specification and delay to… Continue reading your intimation on telephonic conversation that client is revising the scope/specification and delay to signing the Terms & Conditions as well as shop drawing
Your quotation reference 266, and to lift chiller from ground to roof at 70 meter
Date: xxx Ref: xxx To : M/s. xxx Transport LLC Project : 2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Atten : Mr. Ikram & Mr. Asjad Subject : Your quotation reference 266, and to lift chiller from ground to roof at 70 meter. Dear Mr.… Continue reading Your quotation reference 266, and to lift chiller from ground to roof at 70 meter
Regarding the glass wool insulation and DCL certificate.
Date:xxx Ref No. xxx To : M/s xxx Kind Attn :xxx Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding the glass wool insulation and DCL certificate. Dear Sir, With reference to the above, we would like to inform you that the Dubai… Continue reading Regarding the glass wool insulation and DCL certificate.
Requirement of single piece gypsum tile panel as per our required size
Date:xxx Ref No. xxx To : M/s xxx Kind Attn :xxx Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Requirement of single piece gypsum tile panel as per our required size Dear Sir, With reference to the above, we would like to request… Continue reading Requirement of single piece gypsum tile panel as per our required size
Common wall door between twin and queen room, redesigned/resubmitted for 102 mm and issue of double shutter interconnecting door
Date:xxx Ref No. xxx To : M/s xxx Kind Attn :xxx Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject Common wall door between twin and queen room, redesigned/resubmitted for 102 mm and issue of double shutter interconnecting door Dear Sir, With reference to the above,… Continue reading Common wall door between twin and queen room, redesigned/resubmitted for 102 mm and issue of double shutter interconnecting door
Our submission of Shop drawing of 2nd floor unit 5 vanity counter and Consultant comment
Date:xxx Ref No. xxx To : M/s Gypsemna Kind Attn :Ms.Abeer Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject: Regarding our submission for Shop drawing of 2nd floor unit 5 vanity counter and Consultant comment Dear Mam,With reference to the above, we are attaching the… Continue reading Our submission of Shop drawing of 2nd floor unit 5 vanity counter and Consultant comment
ID drawing, their requirement of back up plywood and request to review
Date:xxx Ref No. xxx To : M/s Gypsemna Kind Attn :Ms.Abeer Project :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Sub: Regarding ID drawing , their requirement of back up plywood and request to review Dear Sir, With reference to the above, we received the shop drawing… Continue reading ID drawing, their requirement of back up plywood and request to review