Date: xxx
Ref: CC/ NAFCO/011/18
To : M/s. xxx FZCO.
Project : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai
Atten : Mr. xxx
Subject : Regarding the color code for the hollow metal door as per their respective location and missing door intimation from your list
Dear Mr. xxx,
With reference to above mentioned subject, we are intimating to proceed for the door fabrication and informing you the following:
1. We are attaching our IRF sheet ref 43 dated 12.04.18 from 1/7 to 7/7 and find the color code which is hand written and mark under the color door type.
2. This only the color code for the color shade only. The color specification should be as per fire rating requirement.
3. We confirmed the site measurement and agreed on 11.04.18 and also informing you for the following missing door which are not in your list.
a. D11- Female Locker/ Change room at Basement 1 -the site measurement was took by Mr. Kishur Lal
b. D11- Cold Food at 1st Floor ( inside main kitchen)- the site measurement was took by Mr. Kishur Lal
c. D13 – Staircase 1 at Lower Roof Level with site measurement of 1140 width x 2100 height
d. D13 – Staircase 2 at Lower Roof Level with site measurement of 1150 width X 2100 height
NOTE: In Item 2 in sheet 1/3 attached measurement sheet , the door for store at Basement 1 is supposed to be in Basement 2.
So, you can proceed for the fabrication as per measurement sheet as signed at site on 11-4-18 and colour as per our RFI ref 43 dated 12-04-18 as well as provide your feedback as soon as possible for item no: 3 (a),(b),(c), and (d) of this communication as mentioned above and reply accordingly
Regards,
For xxx Contracting L.L.C
xxx
Project Manger