Tower Crane Support

Regarding Confirmation and No –Objection to Remove the Tower Crane Support

Date:               xxx

To                   : xxx Contracting

Kind Attn        : Mr. xxx Vangani /Mr. xxx

Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai

Subject          :  Regarding Confirmation and No –Objection to Remove the Tower Crane Support @ 3rd Flr. and same System and Drawing can be used in  11th Flr. Slab

Dear Sir ,

With reference above, we are confirming that after fixing the support between  6th-7th  Flr. We do not required the existing support at 3rd Flr.  and same support removed and fixed at 11th Flr. as per attached drawing which is used in 6th Flr. in same.

Furthermore we are confirming that as per joint reaction and design in the drawing is safe and sound to fixed at 11th Flr by using the system from 3rd Flr.

So we are acknowledging and confirming the removal of support at 3rd Flr. and fixing at 11th Flr. for further extension of the Tower Crane.

Regards,

Authorized Signatory

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top