25/4/2017
Ref: DESCTEC-RFI-City Max-002
To: M/s xxx consulting
Atten: Mr. xxx
Ref: Arrangement for the following requirements for the project.
Sub: Request for Stag Bar Details
Dear Sir,
With reference to the discussion we had during our last visit, I would like to draw your attention for the requirement for the following project. Please provide us with the following requirement:-
Related posts:
Submission of Minutes of Meeting Held on 25th April 2017 with Hpg
Immediate Meeting for the Façade Lighting Since Your Proposal in the Glass Area and Issue
- The MEP Shop Drawings including IT/AV drawings.
- Kitchen equipment drawings with details.
- Door and window schedule including accessories details.
- Sample board
- Termination details.
- MEP Cont. Time Line.
Kindly take action and do needful at the earliest possible.
Thanks and Regards,
xxx contracting L.L.C
xxx
Project Manager