Substation room

Modification in electrical room located at pool deck area

Date:               xxx

Ref:                  xxx

Kind Attn         :Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai

Subject        : Variation for Raised floor and Epoxy Coating in GSM Room at 14th Floor as required by CADDEMIRATES Subcontractor.

Subject        : Modification in electrical room located at pool deck area to increase the room length from 3 m to 4.16m by shifting the wall with door upto slab edge

Dear Sir,

With reference to above, we would like to inform you that we shifted all the electrical DB’s inside the existing electrical room and these DB’S door can not be opened and difficult to accommodate all the DB’S in existing available room size.

Kindly note the following:

1) We are submitting the proposal of increasing the electrical room size upto external face of the existing upper roof slab line

2) The existing drawing and new drawing proposal along withAutocadd soft copy attached herewith

3) We have to demolish the existing wall and to reconstruct the new wall as per attached drawing to accommodate the DB’S

So, this is for our kind information and to review the requirementof MEP sub contractor to modify the electrical room and advice accordingly.

Regards,

For xxx Contracting L.L.C.