Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai
Subject : Regarding issue raised by xxx Emirates in minutes of meeting item no 5.9,C for cable inside the lift and inter connection in the lift( WIFI and camera cable and connection)
Dear Sir,
With reference to above we would like to inform you that there is a camera in the lift and Wifi system and xxx Emirates has raised the concern as described below:
- CADD Emirates stated that they will leave the CAT6 cable in the lift shaft and the connectivity of CAT6 cable in the lift car is not the scope of the CADD Emirates including additional cable which required with the cabin that will be travel with the lift cabin.
- We had the meeting with Schindler in presence of CADD Emirates and the lift subcontractor confirm that the scope described by CADD Emirates for wireless and camera are not in their scope.
So,we would like to request you to confirm from the employer that to whom they will assign this additional scope of cabling and interfaceconnectivity inside the lift for camera and wireless.
Since the xxx Emirates and Schindler concern for the scope is explained above and the CADD Emirates have limited scope in the lift area as per their contract.
This is for your kind information and to do needful immediately.
Regards,
For xxx Contracting L.L.C.
xxx
Project Manager