Date: xxx
Ref: xxx
Kind Attn :Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai
Subject : Requirement for background music system to prepare the shop drawing by sub contractor.
Dear Sir,
With reference to above we held the meeting with background music system subcontractor M/s Al xxx Technologies on dated xxx and they required the some information which are attach herewith the Minutes of Meeting No 1.
So, kindly review the attachment M.O.M No 1 and provide the required information and note that the shop drawing will be submitted after your replay for the requirement.
Regards,
For xxx Contracting L.L.C.
xxx
Project Manager