awaiting-response

REQUEST FOR THE FEEDBACK OF ID DRAWINGS

Date: xxx

Ref. xxx

Kind Attn:     Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotels Building

Plot No.:          xxx at Al Barsha 1st, Dubai

Subject          :  REQUEST FOR THE FEEDBACK OF ID DRAWINGS

Dear MEP team,

With reference to the above, we would like to inform you that we have submitted ID drawings for first floor and ground floor.

We did not received feedback, the detail layout as per the shop drawing for toilet. So, kindly provide the feedback for the following:

1) The layout of the toilets to be match with approved drawing and the tile size as well as the elevation from ground floor and first floor.

2) Wherever required the power supply provision for any digital signage or hand drier need to be received according to the drawing.

3) Toilets we need an approval for which will be used for mock up room in general.

a) Float traps cover, type, brand and name or approved sample.

b) Other fixing accessories bottle trap and angle work.

c) Civil accessories’ or fitting like water, framing as well as other accessories including mirror.

Regards,

For xxx Contracting L.L.C

xxx

General Manager                      

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top