Regarding renewal of Permit for Building construction or Demolition

Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project:             2B+G+14+Lower Roof xxx Hotel Building Plot No. :           xxx Location:           Al Barsha 1st, Dubai, UAE Client:                xxx Consultant:        M/S. xxx Consulting Architects & Engineering Subject            : […]

No Objection from xxx Contracting LLC (Main Contractor to release the shoring contracting deposits with RTA)

Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project:             2B+G+14+Lower Roof xxx Hotel Building Plot No. :           xxx Location:           Al Barsha 1st, Dubai, UAE Client:                xxx Consultant:        M/S. xxx Consulting Architects & Engineering Subject:          No […]

Requirement of Anti Carbonated Paint System details for tomorrow’s meeting

Date: xxx Ref. xxx To:                    Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject:           Requirement of Anti Carbonated Paint System details for tomorrow’s meeting Dear Sir, With ref. to above, there is meeting held tomorrow dt.25.07.16 at 2:00PM where you have to bring the anti-carbonated paint related technical […]

Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal

Date: xxx Ref. xxx To:                    Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject:             Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal. Dear Sir,      With ref. to above our painting proposal which is submitted on 18.4.16 returned back on 9.15.16 mentioned […]

previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached)

Date: xxx Ref. xxx To          :              xxx Building material Supply                             Tel-xxx Kind Attn            : The Manager Project                   : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:  previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached) Dear Sir, With the reference to the […]

Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project

Date: xxx Ref. xxx To          :              xxx Building material Supply                             Tel-xxx Kind Attn            : The Manager Project                   : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:  Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project Dear Sir, […]

Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues

Date:xxx Ref No. xxx To                    : M/s xxx Project             :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject           : Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Dear Sir, With reference to the above, we would like […]

To provide CCTV approved drawing from authority to remove the special condition from the original permit prior to BCC

Date: xxx                   Ref. xxx To                  :  M/s. xxx Communication DMCC Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E. Client         :   Mr. xxx Subject :  To provide CCTV approved drawing from authority to remove the special condition from the original permit prior to BCC […]