Glass partition inspection in unit no: 1on 19-03-18 by client xxx and his comments

Date: xxx CC/GM/001/18 To                     :  M/s Glass and Mirror  LLC Kind Atten       : Mr. Mohammed Essam Project            :  2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al   Barsha 1st, Dubai U.A.E.  Subject          : Glass partition inspection in unit no: 1on 19-03-18 by client (Mr. Shailen Verma, Citymax) comments Dear Sir, As […]

Regarding material delivered and discrepancy created intentionally in your organization

Date: xxx CC/FUTURE/002 To:                      M/s xxx Formwork systems Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. 373-1297 at Al Barsha 1st, Dubai Subject:             Regarding material delivered and discrepancy created intentionally in your organization Dear Sir, With ref. to above , We are not agree with your statement because our previous letter is self-explanatory […]

Regarding material delivered and discrepancy created intentionally in your organization

Date: xxx CC/FUTURE/001 To:                      M/s xxx Formwork systems Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. 373-1297 at Al Barsha 1st, Dubai Subject:             Regarding material delivered and discrepancy created intentionally in your organization Dear Sir, With ref. to above ,we would like to highlight that, we face a lots of problems right from […]

Endorsement of LOI and work order by main contractor

Date                : xxx Ref                   : CC/269/AAH/01 To                    : M/S xxx Hospitality Project            : 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject           : Endorsement of LOI and work order by main contractor Dear Sir, With ref. to above, we are main contractor xxx Contracting LLC, Tel: 04887788/3477218, Fax: 048867700, […]

Regarding discrepancies in number of bar per column cannot be accommodated and need to redesign

Date:               xxx Ref:                 CC/269/TALA/02 To:                    TALA CONCRETE REPAIRS Kind Attn:       Mr. Abdur Rahman Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha  1st, Dubai U.A.E Subject:     Regarding discrepancies in number of bar per column cannot be accommodated and need to redesign Dear Mr. Abdur Rahman, With reference to the […]

Regarding query for beam jacketing at site

Date:               xxx Ref:                 CC/269/eF/03 To:                     eFORCE Engineering Consultancies Kind Attn:       Dr. xxx Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha   1st, Dubai U.A.E Subject:           Regarding query for beam jacketing at site   Dear Sir, With ref. to above kindly confirm, the 10mm anchor bars which will be fixed […]

Regarding quotation for strengthening of Beam / Beam jacketing

Date:               xxx Ref:                 CC/269/eF/02 To:                   TALA CONCRETE REPAIRS Kind Attn:     Mr. Abdur Rahman Project:          2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha  1st, Dubai U.A.E Subject:         Regarding quotation for strengthening of Beam / Beam jacketing Dear Mr. Abdur Rahman, We are attaching the required concrete quantity and Beams surface […]

Structural Guarantee of the beam jacketing

Date:               xxx Ref:                 CC/269/eF/01 To:                     xxx Engineering Consultancies Kind Attn:       Dr. xxx Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha  1st, Dubai U.A.E Subject:           Structural Guarantee of the beam jacketing Dear Sir, With ref. to above, provide us the supervision cost and the guarantee for the strengthening of […]

Request to arrange materials

Date: xxx CC/DG/02/16 To       :              M/s xxx Gulf Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. 373-1297 at Al Barsha 1st, Dubai Subject:             Request to arrange materials Dear Mr.Jaseem, With ref. to above, we would like to inform that the painting workers are suffering today at site because of the unavailability of platform materials […]

Regarding your site inspection report on 09-07-2017 for LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011.

Date: xxxRef No: CC/DT/DM/16 To,The Dubai MunicipalityBuilding Control SectionDubai, UAE Project           : 2B+G+14+LR Hotel Building on Plot No. xxx, Al Barsha, Dubai Sub              : Regarding your construction site inspection report on 09-07-2017 for LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011. Dear Sir, As per your site visit and inspection on 09-07-2017 for products covered by DM regulations […]