Method of Statement of GRP Lining Works

Method of WorkingAl Marwa Fiber Glass Factory required these steps for Surface Preparation, before start thework. These steps must be done by Contractor/Owner.GRINDING:After concreting many irregularities on the surface remain and if lamination iscarried out on such surface finishing on the outer surface will be inferior. Hence, surfacegrinding of concrete has to be done, if necessary. This removes all irregularities […]

Reminder of Our Letter Ref No.CC/HC/018 dated on xxx

Date : xxx Ref no : CC/HC/018 To : M/s xxx Center Attn.             : Mr. xxx Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai Subject : Reminder of Our Letter Ref No.CC/HC/018 dated on 30.05.2018 Dear Mr.xxx, With reference of the above we would like to inform you that […]

Regarding your submitted variation to consultant and find consultant’s reply for your review and re-submission

Date : xxx Ref no : CC/HC/017 To : M/s xxx Center Attn.             : Mr. xxx Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai Subject : Regarding your submitted variation to consultant and find consultant’s reply for your review and re-submission Dear Mr.xxx, With reference to above mentioned subject, […]

Regarding your submission of current invoice and to claim of material delivery

Date: xxx Ref no: CC/HC/016 To                : M/s xxx Center Attn.              : Mr. xxx Project       : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai Sub                : Regarding your submission of current invoice and to claim of    material delivery                   Dear Mr.Daniel,          With reference to above we are hereby inform you that […]

Confirmation to toilet door frame width for single shutter non sliding door area.

Date: xxx Ref no: CC/HC/015 To                : M/s xxx Center Attn.             : Mr. xxx Project       : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai Sub                : Confirmation to toilet door frame width for single shutter non sliding door area. Dear Mr.xxx,          With reference to above we would like to inform […]

To provide protective coating for all wood members will be fixed above Ceiling as instructed and required by consultant.

Date: xxx Ref no: CC/HC/014 To                : M/s xxx Center Attn.             : Mr. xxx Project       : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai Sub                : To provide protective coating for all   wood members will be fixed above Ceiling as instructed and required by consultant. Dear Sir, With reference to the above mentioned […]

Regarding your measurement sheet & discrepancy and our concern.

Date: xxx Ref no: CC/HC/013 To               : M/s xxx Center Attn.            : Mr. xxx Project       : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai  Sub               : Regarding your measurement sheet & discrepancy and our concern. Dear Sir, With reference to above, we would like to seek your explanation for the following. […]

Regarding your mail reference dated on xxx

Date: xxx Ref no: CC/HC/012 To               : M/s xxx Center Attn.           : Mr. xxx   Project      : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai  Subject       : Regarding your mail reference dated on 18/09/17 @ 9.54 AM.  Article-A- Attachment page no 1/7 HC -Initially the Architrave was at 100mm and when […]

Regarding Non Compliance Report by reducing the architrave size and not matching with approved drawing

Date: xxx Ref no: CC/HC/011 To             : M/s xxx Center Attn.         : Mr. xxx   Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,    Dubai  Subject    : Regarding Non Compliance Report by reducing the architrave size and not matching with approved drawing. Dear Sir, With reference to the above, we intimated […]