Guide line for surveyor work
Date: xxx CC/SITE/07/16 Kind Attn: Land surveyor Project: 2B + G + 14 + Lower Roof Hotel Building Plot No.: 373-1297 at Barsha, Dubai Subject: Guide line for surveyor work Dear Surveyor, Kindly note the following: Surveyor must report at the site to PM –Mr. xxx where all the level of points are to […]
Guide line for surveyor work Read Post »