Issue with Wooden and Joinery works subcontractor

Ref.      :           XX/1007/AGC/2021/41                                         Date: February 06, 2021 To        :           M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: +XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject:           Issue with Wooden and Joinery works subcontractor. Dear Sir, With reference to aforementioned subject, we wish to inform […]

Notification of Variation for Tile Chamfering and Polishing.

Date: October 7, 2021 Ref.: XXX/1007/AGC/43/2021 Total Pages: 1 To, M/s. M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX, Fax: +XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, XXX, Dubai. Subject:           Notification of Variation for Tile Chamfering and Polishing. Dear Sir, With reference to above mentioned subject, we […]

Update of lift nominated sub-contractor Schindler Pars Intl Ltd

Date: xxx Ref: CC/AP/118/16 To:                   M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:        Mr. xxx Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject:            Regarding update of lift nominated sub-contractor and update for follow up with Schindler Pars Intl Ltd Dear Sir, With reference to the above subject, […]

METHOD STATEMENT FOR PLANTED COLUMNS

INTRODUCTION:- The project is Consist “Proposed B+G+1 Villa on Plot No. xxx at Jumeirah First, Dubai for “Mr. xxx” THE METHOD FOR PLANTED COLUMNS IS AS FOLLOWS: – Firstly, the Planted Columns will be marked by hiring of a specialize survey company M/s. Middle East Survey Engineering LLC. Upon marking of all Planted Columns over ground floor we will make […]

Method of Statement of False Ceiling/Suspended ceiling works

Introduction Scope & Objective. Equipment’s & Tools/ Manpower/ Materials. How work is being Started. Setting Out. Ceiling suspension. Inspection/ Clearance. Joint Compound, Joint Taping Work. AC Grill, Light Cutting & Access Panel Fixing. Contact Us. Introduction –What is a false ceiling?A false ceiling or alternatively called drop ceiling is a fixed framework made of either aluminium, metal or wooden batten […]

METHOD STATEMENT FOR FLOOR EPOXY SCREEDING & COATING WORKS

SURFACE PREPARATION Prepare the surface by grinding. After the grinding, clean the surface with vacuum cleaner. The substrate should be sound wrt – no loose or crumbling concrete; no unbounded cement particles; no previously applied toppings, sealers or paints. Care must be taken that the temperature of the floor and the ambient temperature should be between 16°C to 30°C to […]

Method of Statement of Tiles Installation works

1.0 OBJECTIVEThis method statement describes a work explanation of the methods and procedure to be carried out for tiles installation works for Construction of B+G+1 FOR MR. XXX in Dubai to ensure that during the entire execution stage, the work is done in line with good engineering practices and in compliance with engineering standard practices, nation & local codes. 2.0 […]

Method of Statement of GRP Lining Works

Method of WorkingAl Marwa Fiber Glass Factory required these steps for Surface Preparation, before start thework. These steps must be done by Contractor/Owner.GRINDING:After concreting many irregularities on the surface remain and if lamination iscarried out on such surface finishing on the outer surface will be inferior. Hence, surfacegrinding of concrete has to be done, if necessary. This removes all irregularities […]