Engineering Submittals

Request to confirm on document that traffic impact study not required for our    small plot as per our project details submitted during construction NOC renewal which required now for external interlocks

Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project:             2B+G+14+Lower Roof xxx Hotel Building Plot No. :           xxx Location:           Al Barsha 1st, Dubai, UAE Client:                xxx Consultant:        […]

Request to confirm on document that traffic impact study not required for our    small plot as per our project details submitted during construction NOC renewal which required now for external interlocks Read Post »

advance payment

No Objection from xxx Contracting LLC (Main Contractor to release the shoring contracting deposits with RTA)

Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project:             2B+G+14+Lower Roof xxx Hotel Building Plot No. :           xxx Location:           Al Barsha 1st, Dubai, UAE Client:                xxx Consultant:       

No Objection from xxx Contracting LLC (Main Contractor to release the shoring contracting deposits with RTA) Read Post »

Textured Anti Carbonated

Requirement of Anti Carbonated Paint System details for tomorrow’s meeting

Date: xxx Ref. xxx To:                    Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject:           Requirement of Anti Carbonated Paint System details for tomorrow’s meeting Dear Sir, With ref. to above, there is meeting held tomorrow dt.25.07.16 at 2:00PM where you have to bring

Requirement of Anti Carbonated Paint System details for tomorrow’s meeting Read Post »

Textured Anti Carbonated

Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal

Date: xxx Ref. xxx To:                    Project:              2B + G + 14 + Lower Roof Hotels Building, Plot No. xxx at Al Barsha 1st, Dubai Subject:             Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal. Dear Sir,      With ref. to above our painting proposal which is submitted on 18.4.16

Regarding Light Textured Anti Carbonated Paint System for the basement and our previous submittal Read Post »

office-checks

previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached)

Date: xxx Ref. xxx To          :              xxx Building material Supply                             Tel-xxx Kind Attn            : The Manager Project                   : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:  previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached) Dear Sir,

previous ref: CC/STSTYLE/001 & attachment of the new balance item sheet. (Kindly ignore previous sheet attached) Read Post »

office-checks

Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project

Date: xxx Ref. xxx To          :              xxx Building material Supply                             Tel-xxx Kind Attn            : The Manager Project                   : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:  Verbal intimation by client that you are nomination to supply that balance item from our list attached for

Verbal intimation by client that you are nomination to supply that balance item from our list attached for our above project Read Post »

Concrete Slump Test

Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues

Date:xxx Ref No. xxx To                    : M/s xxx Project             :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject           : Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Dear Sir, With reference to

Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Read Post »