Guide line for surveyor work

surveyor work

Date: xxx CC/SITE/07/16 Kind Attn:          Land surveyor Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Guide line for surveyor work Dear Surveyor, Kindly note the following: Surveyor must report at the site to PM –Mr. xxx where all the level of points are to… Continue reading Guide line for surveyor work

Micro level detailing of Structural drawings

calculate the variation from tender and revised drawing

Date: xxx CC/SITE/06/16 Kind Attn:         xxx Rai Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:           373-1297 at Barsha, Dubai Subject:          Micro level detailing of Structural drawings Dear Foreman, Regarding block work and Block status, inspection is done without chipping. Toilet D2 sub frame is not fixing in Basement 02… Continue reading Micro level detailing of Structural drawings

Micro level detailing of Structural drawings

calculate the variation from tender and revised drawing

Kind Attn:        Ms.xxx Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:           373-1297 at Barsha, Dubai Subject:          Micro level detailing of Structural drawings Dear Manisha, You have to prepare micro level detailing of structural drawings of the following: All structural drawings details related to column, core wall and slab for all… Continue reading Micro level detailing of Structural drawings

Responsibility of Site Engineer

Understand the given instructions

Date: xxx CC/SITE/3/16 Kind Attn:        Mr. xxx Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Responsibility of Site Engineer Dear xxx, Understand the following and confirm. DM approved drawings to be followed always S.no Work Allotted Reply   1   Alignment of Columns and RC… Continue reading Responsibility of Site Engineer

Calculate the variation from tender and revised drawing

calculate the variation from tender and revised drawing

Date: xxx CC/SITE/2/16 Kind Attn:        Mr.xxx Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:    calculate the variation from tender and revised drawing       Dear xxx, We need the following in writing by today We assigned you to calculate the variation from tender and revised drawing 15 days… Continue reading Calculate the variation from tender and revised drawing

Understand the given instructions

Understand the given instructions

Date: xxx CC/SITE/1/16 Kind Attn:        Mr.xxx, Mr.xxx, Mr.xxx Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Understand the given instructions Dear All, Understand the following and confirm Work will be executed from approved DM drawing and gridline reference from DM approved drawing. Do not allow… Continue reading Understand the given instructions

Cancellation of Internal Daily Co-ordination Meeting

Engineer's Training

CIRCULAR Date: 02.06.16                                                Kind Attn:        M/s xxx General Contracting LLC Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:          373-1297 at Barsha, Dubai Subject:           Cancellation of Internal Daily Co-ordination Meeting Dear All,             As per oral discussion and instruction of Mr.xxx, that our co-ordination meeting has no meaning or any result… Continue reading Cancellation of Internal Daily Co-ordination Meeting

Performance of Engineer xxx

Engineer's Training

Date: xxx To:                  xxx Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject:          Performance of Engineer xxx Dear xxx,  you are at site for a month and kindly note the following We selected you on the basis of your experience in UAE as Project… Continue reading Performance of Engineer xxx

Regarding your mail to our client and CC to us to provide power provision for external signage

Internal Signages

Date: xxx CC/BRAND/006/18 To                     :  M/s xxx Plus Sign LLC Project            :  2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al   Barsha 1st, Dubai U.A.E.  Subject            :Regarding your mail to our client and CC to us to provide power provision for external signage     Dear Sir,… Continue reading Regarding your mail to our client and CC to us to provide power provision for external signage