Date: xxx CC/FUTURE/001 To: M/s xxx Formwork systems Project: 2B + G + 14 + Lower Roof Hotels Building, Plot No. 373-1297 at Al Barsha 1st, Dubai Subject: Regarding material delivered and discrepancy created intentionally in your organization Dear Sir, With ref. to above ,we would like to highlight that, we face a… Continue reading Regarding material delivered and discrepancy created intentionally in your organization
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Endorsement of LOI and work order by main contractor
Date : xxx Ref : CC/269/AAH/01 To : M/S xxx Hospitality Project : 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject : Endorsement of LOI and work order by main contractor Dear Sir, With ref. to above, we are main contractor xxx Contracting… Continue reading Endorsement of LOI and work order by main contractor
Regarding discrepancies in number of bar per column cannot be accommodated and need to redesign
Date: xxx Ref: CC/269/TALA/02 To: TALA CONCRETE REPAIRS Kind Attn: Mr. Abdur Rahman Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject: Regarding discrepancies in number of bar per column cannot be accommodated and need to redesign Dear Mr. Abdur… Continue reading Regarding discrepancies in number of bar per column cannot be accommodated and need to redesign
Regarding query for beam jacketing at site
Date: xxx Ref: CC/269/eF/03 To: eFORCE Engineering Consultancies Kind Attn: Dr. xxx Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject: Regarding query for beam jacketing at site Dear Sir, With ref. to above kindly confirm, the 10mm anchor… Continue reading Regarding query for beam jacketing at site
Regarding quotation for strengthening of Beam / Beam jacketing
Date: xxx Ref: CC/269/eF/02 To: TALA CONCRETE REPAIRS Kind Attn: Mr. Abdur Rahman Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject: Regarding quotation for strengthening of Beam / Beam jacketing Dear Mr. Abdur Rahman, We are attaching the required… Continue reading Regarding quotation for strengthening of Beam / Beam jacketing
Structural Guarantee of the beam jacketing
Date: xxx Ref: CC/269/eF/01 To: xxx Engineering Consultancies Kind Attn: Dr. xxx Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai U.A.E Subject: Structural Guarantee of the beam jacketing Dear Sir, With ref. to above, provide us the supervision cost and the… Continue reading Structural Guarantee of the beam jacketing
Request to arrange materials
Date: xxx CC/DG/02/16 To : M/s xxx Gulf Project: 2B + G + 14 + Lower Roof Hotels Building, Plot No. 373-1297 at Al Barsha 1st, Dubai Subject: Request to arrange materials Dear Mr.Jaseem, With ref. to above, we would like to inform that the painting workers are suffering today at site because of… Continue reading Request to arrange materials
Regarding your site inspection report on 09-07-2017 for LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011.
Date: xxxRef No: CC/DT/DM/16 To,The Dubai MunicipalityBuilding Control SectionDubai, UAE Project : 2B+G+14+LR Hotel Building on Plot No. xxx, Al Barsha, Dubai Sub : Regarding your construction site inspection report on 09-07-2017 for LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011. Dear Sir, As per your site visit and inspection on 09-07-2017 for… Continue reading Regarding your site inspection report on 09-07-2017 for LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011.
Application no xxx- Undertaking letter
Date:xxxRef No: CC/DT/DM/15 To,The Dubai MunicipalityBuilding Control SectionDubai, UAE Project : 2B+G+14+LR Hotel Building on Plot No. 3731297, Al Barsha, Dubai Sub : Application no 241570-26-1- Undertaking letter Dear Sir, “This is in reference to the DM application no 241570-26-1 . We undertake any damage to the existing beams for connections to Steel structure… Continue reading Application no xxx- Undertaking letter
Undertaking for the construction joint for the pool construction at LB-102 for pool slab and method statement.
Date: xxx Ref no: CC/DT/DM/14 To, Dubai Municipality Building Control section Dubai, UAE Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub : Undertaking for the construction joint for the pool construction at LB-102 for pool slab and method statement. Dear Sir, With reference to… Continue reading Undertaking for the construction joint for the pool construction at LB-102 for pool slab and method statement.