Date: xxx Ref no: CC/DT/DM/13 To, Dubai Municipality Building Control section Dubai, UAE Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub : Undertaking for law height form work for slab above ettic slab (0.7m height) and pool deck. Dear Sir, With reference to the… Continue reading Undertaking for law height form work for slab above ettic slab (0.7m height) and pool deck.
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor
Date: xxx Ref no: CC/DT/DM/12 To, Dubai Municipality Building Control section Dubai, UAE Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub : Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Dear… Continue reading Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor
Incident Report and Documents Submission
Date: xxx Ref no: CC/DT/DM/17 To, Dubai Municipality Dubai, UAE Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-xxx at Barsha, Dubai Sub : Incident Report and Documents Submission Dear Sir, With reference to the above, we are submitting all the required documents as per your instructions and as… Continue reading Incident Report and Documents Submission
Undertaking letter by Main contractor for structural safety /building safety as required in application no: xxx.
Date: xxx Ref no: CC/DT/DM/09 To, Dubai Municipality Building permit section Dubai, UAE Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-xxx at Barsha, Dubai Sub : Undertaking letter by Main contractor for structural safety /building safety as required in application no:241570-23-1. Dear Sir, With reference to the… Continue reading Undertaking letter by Main contractor for structural safety /building safety as required in application no: xxx.
Engineers are ready for training required for xxx Contracting L.L.C License no: xxx
Date: xxx Ref no: CC/DT/DM/06/16-1 To The Manager, DM Qualification Section (License) xxx Municipality, Dubai UAE Sub: Engineers are ready for training required for xxx Contracting L.L.C License no: xxx Dear Sir, With ref. to above and requirement our engineers are ready to take the training immediately with your appointment. So, kindly provide immediate appointment… Continue reading Engineers are ready for training required for xxx Contracting L.L.C License no: xxx
Balance work at 14 th floor and three nos of door not fixed as well as still Architrave not fixed up to now and pool quality work
Date : xxx Ref No. : CC/DESTEC/023 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE Project : 2B+G+14+Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha Subject : Balance work at 14 th floor and three nos of door not fixed as well as still Architrave not fixed up to now… Continue reading Balance work at 14 th floor and three nos of door not fixed as well as still Architrave not fixed up to now and pool quality work
Serious concerned over failure of fixing doors at 14th floor
Date : xxx Ref No. : CC/DESTEC/022 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE Project : 2B+G+14+Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha Subject : Serious concerned over failure of fixing doors at 14th floor Dear Mr.xxx, With reference to the above, we are expressing serious concerned over… Continue reading Serious concerned over failure of fixing doors at 14th floor
To fix the floor tile in first floor corridor outside of All Day Dining
Date : xxx Ref No. : CC/DESTEC/021 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE Project : 2B+G+14+Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha Subject : To fix the floor tile in first floor corridor outside of All Day Dining Dear Mr.xxx, With reference to the above, we have… Continue reading To fix the floor tile in first floor corridor outside of All Day Dining
Regarding Fire Rating Certificate for the wooden Doors
Date : xxx Ref No. : CC/DESTEC/020 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE Project : 2B+G+14+Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha Subject : Regarding Fire Rating Certificate for the Doors Dear Mr. xxx, With reference to the above, all doors must be Fire rated as per… Continue reading Regarding Fire Rating Certificate for the wooden Doors
Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated xxx and revert back
Date : xxx Ref : CC/DESTEC/019 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE. Project : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha, Dubai. Subject : Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated 11/01/2017 and revert back… Continue reading Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated xxx and revert back