Dry Mix Concrete

Request to provide confirmation of maximum time allowable to use the Drymix at the site.

Date: xxx

Ref:   CC/269/qmix/01

To:                   Q.Mix

Kind Attn:        The Manager

Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st,        Dubai U.A.E

Subject:           Request to provide confirmation of maximum time allowable to use the Drymix at the site which is our consultant – “Arkiplan Consulting Architects and Engineers” requirement for our above mentioned project

Dear Sir,

With reference to the above, normally we are getting the dry mix from your company for casting of lintel, stiffener column, copping beam/mid beam as well as low height design element.

So, we need a confirmation letter from your office to confirm the total duration time for dry mix from the dispatch time with in how many hours dry mix can be used at the site and also recommend the measures/ precautions to use dry mix at the site.

So, kindly provide us a letter attending to our consultant and provide the same.

Thanks for your cooperation in advance.

Regards,

For xxx Contracting L.L.C

xxx

General Manager

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top