Coordination Drawing for MEP Equipment

Provide Roof Coordination Drawing and Loading for MEP Equipment

Date: xxx

CC/AP/MG/06/16

Kind Attn:     Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotels Building

Plot No.:          373-1297 at Al Barsha 1st, Dubai

Subject:           Provide Roof Coordination Drawing and Loading for MEP Equipments

Dear Mr. xxx,

With reference to above mentioned subject, as we discuss since many months to provide roof coordinated layout with dimension including weight of foundation and weight of equipment for post tension roof sale design and note the following:

  1. Roof coordinate layout with dimension and exact position for all services placed at roof.
  2. Water tank location.
  3. Water tank foundation with height and width as per supplier requirement to calculate dead load.
  4. Water tank self weight.
  5. Weight of water as per approved size by consultant and scope.
  6. All AC foundation either solid or floating foundation.
  7. Any other equipment near water tank for chilled water or water purification plant, pool equipment room, weight of equipment and subcontractor.
  8. Fresh air machine and position as well as foundation size and machine weight.

So please provide as required immediately. Now we are at the middle of the project and we discussed all of this many months before and still we are waiting.

Hope you understand seriousness and we need all on urgent basis.

Regards,

For xxx Contracting L.L.C

xxx

General Manager 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top