Structural Guarantee of the beam jacketing

Date:               xxx

Ref:                 xxx

To:                     xxx Engineering Consultancies

Kind Attn:       Dr. xxx

Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha  1st, Dubai U.A.E

Subject:           Structural Guarantee of the beam jacketing

Dear Mr. Abdur Rahman,

We are attaching the required concrete quantity and Beams surface area as well as drawing. Kindly provide your best quote as we discussed.

  1. Total quantity of the concrete is                 11.82 cum
  2. The total surface area of the Beams is        98.47 sqm
  3. Materials will be supplied and scaffolding will be erected by the Chirag Contracting LLC
  4. Your quote for Drilling, Anchoring and shuttering
  5. Core cutting and pouring of concrete will done by chirag Contracting LLC
  6. Pump for concrete and supervise by Tala Concrete Repairs
  7. Latter of Guarantee to be provided as we discussed.

Regards,

For xxx Contracting L.L.C

xxx

General Manager