Dear Sir,
With reference to above, we cannot decide the window contact location and position until you will not fix the permanent window at floor nos. 2 and 3 in unit nos. 5 and 6 and note the following:
- After fixing the window our MEP team can assess and finalize the method and sequence and position of the contact.
- We want to assess any particle difficulties for wire pulling to mitigate any risk before tile fixing and partition close up.
- It will be cross check for our grove line and level with aluminum drawing, so we can avoid other issue in elevation
So, kindly do the needful and fix the window unit nos. 5 and 6 at right side elevation.
Soon after this and inspection you can take site measurement and go ahead for rest of the area production, wherever did plaster.