<strong>To fox window at unit nos. 5 and 6 from 2nd to 3<sup>rd</sup> floor for contact  </strong>

To fox window at unit nos. 5 and 6 from 2nd to 3rd floor for contact  

                           position and eliminate any risk.

Date: xxx

Ref. xxx

To:                     M/s. xxx , Metal Wowks

Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai

Subject            :To fox window at unit nos. 5 and 6 from 2nd to 3rd floor for contact  

                           position and eliminate any risk.

Dear Sir,

With reference to above, we cannot decide the window contact location and position until you will not fix the permanent window at floor nos. 2 and 3 in unit nos. 5 and 6 and note the following:

  1. After fixing the window our MEP team can assess and finalize the method and sequence and position of the contact.
  • We want to assess any particle difficulties for wire pulling to  mitigate any risk  before tile fixing and partition close up.
  • It will be cross check for our grove line and level with aluminum drawing, so we can avoid other issue in elevation

So, kindly do the needful and fix the window unit nos. 5 and 6 at right side elevation.

Soon after this and inspection you can take site measurement and go ahead for rest of the area production, wherever did plaster.

Regards,
For xxx Contracting L.L.C

xxx

Project Manager