Damage of Existing Asphalt

Reply – Damage of Existing Asphalt by Building Contractor

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Reply – Damage of Existing Asphalt by Building Contractor. Dear Sir, With reference to the above-mentioned subject and letter Ref. 215/S 003-Package1/18M026 dated 22th March 2020 from Parsons Overseas Limited, we wish to inform you that we have cleaned all […]

Reply – Damage of Existing Asphalt by Building Contractor Read Post »

Notification of Variation

Notification of Variation for sloid block wall beneath compound wall Tie Beam

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Notification of Variation for sloid block wall beneath compound wall Tie Beam. Dear Sir, With reference to the above-mentioned subject, we wish to put on record that as per tender drawing there is no solid block wall below tie beam

Notification of Variation for sloid block wall beneath compound wall Tie Beam Read Post »

Fixing of PVC Banner

Commercial Proposal for Supply/Fixing of PVC Banner

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Commercial Proposal for Supply/Fixing of PVC Banner  Dear Sir, With reference to the above-mentioned subject, we hereby submitting commercial proposal for the Supply/fixing of the M/s. xxx PVC Banner as follows: – SL. No. Description Quantity Price(AED) Total (AED) Option

Commercial Proposal for Supply/Fixing of PVC Banner Read Post »

Notification of Variation

Notification of Variation

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Notification of Variation Dear Sir, With reference to the above-mentioned subject, we wish to put on record that there is some variation as per revised Drawing issued on dated 18th February 2020. The major changes are Door Height. We shall

Notification of Variation Read Post »

HVAC WORKS

Submission of Revised commercial proposal for HVAC works.

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Submission of Revised commercial proposal for HVAC works. Reference:       BOQ REF. 4/52/A Dear Sir, With reference to the above-mentioned subject and as per your email dated 18/02/2020 regarding confirmation on selection of equipmnts, we hereby submitting Revised commercial proposal for

Submission of Revised commercial proposal for HVAC works. Read Post »

BOQ

Amended BOQ

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Amended BOQ Dear Sir, With Reference to the above mentioned subject, kindly find attached Amended BOQ (3-sets) for the above mentioned project. You are kindly requested to provide us Client and Consultant sign/stamp on the same in order to submit

Amended BOQ Read Post »

Nomination of Provisional Sum

Delay in Nomination of Provisional Sum & Prime Cost Subcontractors

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Delay in Nomination of Provisional Sum & Prime Cost Subcontractors Reference:       MCM/AAZ/OCAC/13/2019 dated 21st January 2020 Dear Sir, With reference to above cited letter, we wish to put on record that there has been a significant delay in nomination of

Delay in Nomination of Provisional Sum & Prime Cost Subcontractors Read Post »

Slab Casting

The Engineer instruction to suspension of roof slab casting

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:          The Engineer instruction to suspension of roof slab casting. Dear Sir, With reference to the above-mentioned subject, we wish to put on record that casting of roof slab has been suspended as per your instruction (email attached). However, casting of

The Engineer instruction to suspension of roof slab casting Read Post »

HVAC WORKS

Submission of commercial proposal for HVAC works

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:           Submission of commercial proposal for HVAC works. Reference:       BOQ REF. 4/52/A Dear Sir, With reference to the above-mentioned subject, we hereby submitting commercial proposal for HVAC works with VRF system. We request to the Engineer to issue Engineer Field Instruction

Submission of commercial proposal for HVAC works Read Post »

Aluminum Windows & False Ceiling

Request to confirm First floor windows and false ceiling height

Date: xxx Ref.: xxx Total Pages: 1 To, xxx Attention:      xxx Project:          xxx. Subject:          Request to confirm First floor windows and false ceiling height. Reference:      MCM/1005/OCAC/15/2020 dated 18th January 2020 Dear Sir, This is further to our letter “MCM/1005/OCAC/15/2020 dated on 18th January 2020” regarding confirmation of first floor windows and false ceiling

Request to confirm First floor windows and false ceiling height Read Post »

Scroll to Top