Fixing of Water Faucet & Water Cooler

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Fixing of Water Faucet & Water Cooler Dear MEP Team,             With reference to the above, the water faucet in the wash room is broken and no one in your side […]

Site Instruction for MEP works

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Site Instruction Dear Mr. Tahir, With reference to above mentioned subject, we are hereby conforming that from the next slab we need the following from you. You are not allowed to […]

Toilet sequence or drainage Piping

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           Toilet sequence or drainage Piping Dear Mr. Tahir, With reference to above mentioned subject, as we discuss since many months to provide roof coordinated layout with dimension including weight of foundation […]

Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F Dear Engr. Mansour , With reference to above there is a […]

Regarding Pending Works and Holding Our Works

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding Pending Works and Holding Our Works Dear Engr. Mansour , With reference to the above mentioned subject, we would like to invite your kind attention that still […]

Regarding Demobilize your Office as well as your program to complete the 100% work in writing

Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding Demobilize your Office as well as your program to complete the 100% work in writing as well as replacement of temporary glasses from front elevation Dear Mr. Sajith, With […]

Regarding to complete balance work, DCD inspection and issue

of cradle rent to complete balance work   Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding to complete balance work, DCD inspection and issue of cradle rent to complete balance work   Dear Mr. Sajith, […]

complete the balance work at front elevation, at main entrance around the revolving door

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject           : Regarding to complete the balance work at front elevation, at main entrance around the revolving door, ramp side elevation (elevation no.4) and GL 25 in elevation 4( full […]

Confirmation to fix window frame as per available site opening for GL-22, 12 No’s, Elevation No: 4

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject           : Confirmation to fix window frame as per available site opening for        GL-22, 12 No’s, Elevation No: 4 Dear Mr. Sajith , With reference to above we are intimating […]