The responsible person is to ensure the control measures below are in place before the activity is carried out
| TASK: Installation of Communication Sub-Ducts | Date: October 29th, 2007 | |||||
| No | ACTIVITY | HAZARD | RISK | CONTROL MEASURES TO MINIMISE / ELIMINATE RISK | RESPONSIBLE PERSON | |
| 1 | Laying Sub-Ducts | Use of hand tools | Cuts, abrasions, broken bones, eye injuries | Supervisor to inspect hand tools prior to commencement of works to ensure tools are in good condition. Site minimum PPE to be worn at all times | ||
| Manual handling operations (MHO’s) | Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries, eye injuries | Maximum use of equipment to reduce need for MHO’s MHO Training prior to any work being carried out (Toolbox talk attached) This training is to be documented Wearing of gloves Wearing of safety shoes Wearing of safety glasses | ||||
| Dust | Poor visibility, respiratory Injuries Dust explosion | An effective Dust suppression programme will be in place prior to the works commencing, and thereafter as necessary to suppress the dust sufficiently. In the event that the dust suppression programme fails operatives will be issued suitable RPE. In the event the dust causes restricted vision, operatives will be removed from the excavation. | ||||
| Extreme heat | Dehydration, heat exhaustion. Heat stroke | Ready supply of cold water and Oral rehydration products ie Salt & Dextrose tablets. No work to be conducted under the sun between 12:00 & 15:00 (July & August only). In the event that natural airflow is restricted, industrial air movers will be employed. No worker shall work within the excavation for longer than 40 minutes without a ten minute break in a shaded area which will be provided for this purpose. | ||||
| Unplanned vehicle movements | Plant on plant incidents. Pedestrian injuries | A strict Plant / Vehicle and operative / pedestrian separation regime will be enforced. | ||||
| This JHA was prepared by:- | This JHA was authorised by:- | |
| Max Morales Safety Manager OAJ-JV Date:- October 29th, 2007 | Ahmed Khadro Section Manager OAJ-JV Date:- October 29th, 2007 |
| TASK:__________________________________________________________________ | Date: ___________________ | ||
| Persons in Charge | Designation | Signature | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 |
All Employees are to sign below in recognition and understanding of this JHA content
| 1 | 11 | 21 | |||
| 2 | 12 | 22 | |||
| 3 | 13 | 23 | |||
| 4 | 14 | 24 | |||
| 5 | 15 | 25 | |||
| 6 | 16 | 26 | |||
| 7 | 17 | 27 | |||
| 8 | 18 | 28 | |||
| 9 | 19 | 29 | |||
| 10 | 20 | 30 |
Related Articles
- Risk Management Principles Simple & Precise Explanation – Risk Management Principles Simple & Precise Explanation
- Risk Assessment Underground Drainage Piping
- Safety Procedure Radiography Safety Procedure – SAFETY PROCEDURE RADIOGRAPHY SAFETY PROCEDURE
- Risk Assessment for Smoke Management System Installation Testing Commissioning
- Risk Assessment Installation, Testing & Commissioning of Fire Fighting Equipment (fire Extinguishers, Fire Hose Reel & Fire Hose Cabinets)