Contractor’s Letters

Engineering Submittals

Addendum for External Paint Rate.

Date: xxx                   Ref. xxx To                  :  M/s. xxx Technical Service LLC. Kind Att        :  Mr. xxx Kumar Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E.    Subject        : Addendum for External Paint Rate.     Dear Sir, With reference […]

Addendum for External Paint Rate. Read Post »

awaiting-response

Regarding our follow up for proper submittal and awaited reply.

Date: xxx                   Ref. xxx To                  :  M/s. xxx Technical Service LLC. Kind Att        :  Mr. xxx Kumar Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E.    Subject        : Regarding our follow up for proper submittal and awaited reply.

Regarding our follow up for proper submittal and awaited reply. Read Post »

Painting works

Regarding daily work progress required by sub-contractor Berger paint at site.

Date: xxx                   Ref. xxx To                  :  M/s. xxx Paint Emirates LTD/ M/s. xxx Technical Service LLC Kind Att        :  Mr. xxx Kumar Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E. Subject        : Regarding daily work progress required by

Regarding daily work progress required by sub-contractor Berger paint at site. Read Post »

delivery of Tiles and cheque copy.

Regarding we handed over the documents in the presence of client and consultant

Date: xxx                   Ref. xxx To                  :  M/s. xxx Paint Emirates LTD/ M/s. xxx Technical Service LLC Kind Att        :  Mr. xxx Kumar Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E.    Subject        : Regarding we handed over the

Regarding we handed over the documents in the presence of client and consultant Read Post »

Painting works

Regarding not execute any work without approval of the material approval and method of statement and sample board

Date: xxx                   Ref. xxx To                  :  M/s. xxx Paint Emirates LTD/ M/s. xxx Technical Service LLC Kind Att        :  Mr. xxx Kumar Project         :  2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at                         Al   Barsha 1st, Dubai, U.A.E.    Subject      : Regarding not execute any work

Regarding not execute any work without approval of the material approval and method of statement and sample board Read Post »

terms and conditions

Main contractors terms and conditions for Painting works LPO

Main contractors terms and conditions for LPO Ref. xxx                                                                                          Date: xxx Project: 2B+G+14F+Lower Roof Hotel Building Plot no: xxx at Al Barsha 1 Client: Mr. xxx Consultant: M/S xxx Consulting Architects and Engineers Scope The measurement at site, surface applied with deduction of all openings. (Both side at the doors and one side of the

Main contractors terms and conditions for Painting works LPO Read Post »

subcontractor contract agreement.

CONTRACT AGREEMENT FOR PAINTING WORKS

CONTRACT AGREEMENT                                                                                                                                       Date: xxx This Agreement is made Between M/s. xxx Contracting LLC (here after called first party), P.O. Box No. 31537 Dubai, UAE. (Herein after referred to as “the Main Contractor”) Ad M/s. xxx Technical Service LLC (here after called second party), (paint supply & apply)/(Herein after referred to as “the Sub-contractor for

CONTRACT AGREEMENT FOR PAINTING WORKS Read Post »

Engineering Submittals

Request to confirm on document that traffic impact study not required for our    small plot as per our project details submitted during construction NOC renewal which required now for external interlocks

Ref: xxx Date: xxx To, Right of way Authority Traffic control Section Dubai, UAE Project:             2B+G+14+Lower Roof xxx Hotel Building Plot No. :           xxx Location:           Al Barsha 1st, Dubai, UAE Client:                xxx Consultant:       

Request to confirm on document that traffic impact study not required for our    small plot as per our project details submitted during construction NOC renewal which required now for external interlocks Read Post »

Scroll to Top