MONTHLY PROGRESS REPORT NO. 13 Month Ending 30th of September 2016 Project No : xxx Project Title : 2B+GF+14 Floors+ Lower Roof Hotel Building Client : xxx Consultant : xxxx Consulting Architechs & Engineers Contractor : xxx Contracting L.L.C. Table of Contents:… Continue reading MONTHLY PROGRESS REPORT
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
METHOD STATEMENT FOR FABRICATION & INSTSALLATION OF WOOD JOINERY WORKS WOODEN DOORS
METHOD STATEMENT FOR DRY WALL/GYPSUM PARTITION
METHOD STATEMENT FOR THE RAFT CONCRETE for the GENERAL AREA ( A2)including VERTICAL WALL AT PUMP ROOM/ WATER TANK AREA
Purpose of WorkThis work procedure describes the method to be adopted for Basement Raft concreting work for the General Area as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C40/20 OPC (120kg)+70% GGBS(280KG) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 48m arm length -01… Continue reading METHOD STATEMENT FOR THE RAFT CONCRETE for the GENERAL AREA ( A2)including VERTICAL WALL AT PUMP ROOM/ WATER TANK AREA
METHOD OF STATEMENT FOR WATERPROOFING MEMBRAIN TO CORRECT LAP LANGTH AT DAMAGE POINTS
METHOD OF STATEMENT FOR WATERPROOFING MEMBRAIN TO CORRECT LAP LANGTH AT DAMAGE POINTS Maximum 50 to 75 mm concrete will be removed only at affected area. Lap length again fixed with melting method because to be sealed the voidsand unseen space or gape to be sealed by pouring method Additional lap restrained The water proofing… Continue reading METHOD OF STATEMENT FOR WATERPROOFING MEMBRAIN TO CORRECT LAP LANGTH AT DAMAGE POINTS