Method of Statement of Post Tension slab works
METHOD STATEMENT FOR THE JACK PROPPING SUPPORT AT BASEMENT 1 SLAB
Purpose of WorkThis work procedure describes the method to be adopted for Jack Propping Support at Basement 1 Slab as shown in thedrawings and as directed by the engineer in charge. Equipment’s Required U – Jack Vertical Slab Base Plate Man Power DeploymentsStaff Details: Project manager Project Engineer Q/A –Q/C Safety Officer ForemanLabour Details: Shuttering… Continue reading METHOD STATEMENT FOR THE JACK PROPPING SUPPORT AT BASEMENT 1 SLAB
METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB
Purpose of WorkThis work procedure describes the method to be adopted for Concreting Work at Ramp Slab as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C45/20 OPC (210kg)+50% GGBS(210kg) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 42m arm length – 1 no. working… Continue reading METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB
METHOD STATEMENT FOR THE CONCRETING of SLAB at BASEMENT 1
Purpose of WorkThis work procedure describes the method to be adopted for Basement 1 Slab Concreting Work as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C40/20 OPC (120kg)+70% GGBS(280KG) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 42m arm length – 2 noS. working… Continue reading METHOD STATEMENT FOR THE CONCRETING of SLAB at BASEMENT 1
METHOD STATEMENT FOR RAMP SLAB FORMWORK AT STARTING POINT
Purpose of work: It describes the methodology for the execution work for the Ramp Slab Formwork from Starting PointEXECUTION Surveyor has given marking for the proper measurement for the Ramp Level and Length. The slope started towards maximum 40 cm. ht. from SSL. After casting the slope area from 0.00 level to 40cm ht., we… Continue reading METHOD STATEMENT FOR RAMP SLAB FORMWORK AT STARTING POINT
METHOD STATEMENT FOR REPAIRING OF BULGED AREA at RETAINING WALL
Purpose of work: It describes the methodology for the execution / treatment for the Bulged Surface Area at Retaining Wall ( Ret. 3A)Reference: Project Specification Approved DrawingEXECUTIONA. Surface Preparation Surveyor give mark for the proper measurement of Retaining Wall thickness. Chipping/ Cutting / Grinding of Mark Excess Concrete will be removed to attain the proper… Continue reading METHOD STATEMENT FOR REPAIRING OF BULGED AREA at RETAINING WALL
METHOD STATEMENT FOR CONCRETE REPAIR AT RETAINING WALL using SPECTITE Swellseal Bentobar
Purpose of work: It describes the methodology for the execution for Concrete Repair at Retaining Wall with PVC Water Stopper using SPECTITE Swellseal Bentobar.EXECUTION FOR CONCRETE REPAIRING WORKA. Surface Preparation All loose materials to be removed from the surface, clean and uncontaminated. Fully clean the concrete and remove any loose or flaking concrete. Oil and… Continue reading METHOD STATEMENT FOR CONCRETE REPAIR AT RETAINING WALL using SPECTITE Swellseal Bentobar
METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT
Purpose of work: It describes the methodology for the execution for the un-even surface at Retaining Wall Vertical Joint. EXECUTION FOR SURFACE PREPARATIONAll loose materials should be removed from the surface by manually chipping of excess concrete until it reached the minimum thickness and by gradual mechanical abrading until it achieved and reached the same… Continue reading METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT
METHOD STATEMENT FOR GYPSUM CEILING WORK
CONTENTS SCOPE OF WORK SUBMITTALS SITE INSTALLATION WORKS FRAME WORK INSPECTION, MEP CLEARNCE & CLOSURE FINISHING GYPSUM BOARD ASSEMBLIES FINAL CHECK UP AND HANDING OVER SNAGGING / DESNAGGING SCOPE OF WORK Supply and installation of Gypsum ceiling all in accordance… Continue reading METHOD STATEMENT FOR GYPSUM CEILING WORK