Submission of Water supply Shop Drawings.

calculate the variation from tender and revised drawing

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Water supply Shop Drawings. Dear Sir, With reference to above mentioned subject, we would like to inform you… Continue reading Submission of Water supply Shop Drawings.

Submission of Final Door Handles Quantity

Door handle

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Final Door Handles Quantity . Dear Sir, With reference to the above mentioned subject, we would like to… Continue reading Submission of Final Door Handles Quantity

Inspection Request for waterproofing works.

Bituminous-Membrane-Waterproofing

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Inspection Request for water proofing. Dear Sir, With reference to the above mentioned subject, we are intimating that water testing… Continue reading Inspection Request for waterproofing works.

Delaying of 2nd Mock up Room Sample Door

hollow-metal-door

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Delaying of 2nd Mock up Room Sample Door. Dear Sir, With reference to the above mentioned subject, we would like… Continue reading Delaying of 2nd Mock up Room Sample Door

Submission of Generator technical

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Generator technical Dear Sir, With reference to the above mentioned subject, we would like to inform you that… Continue reading Submission of Generator technical

G.I Duct work for Kitchen and Toilet

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: G.I Duct work for Kitchen and Toilet. Dear Sir, With reference to the above mentioned we would like to inform… Continue reading G.I Duct work for Kitchen and Toilet

Close the Leakage at 1st Basement

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Close the Leakage at 1st Basement Dear Sir, With reference to the above mentioned subject, we are here by informing… Continue reading Close the Leakage at 1st Basement

False Ceiling Clearance at 1st & 2nd Floor.

ceiling-works

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: False Ceiling Clearance at 1st & 2nd Floor. Dear Sir, With reference to the above mentioned subject & project. We… Continue reading False Ceiling Clearance at 1st & 2nd Floor.

Submission of CFD (Basement Exhaust Fan) 3 set with soft copy.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of CFD (Basement Exhaust Fan) 3 set with soft copy. Dear Sir, With reference to the above mentioned subject.… Continue reading Submission of CFD (Basement Exhaust Fan) 3 set with soft copy.

Safety Comply Report

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject:      Safety Comply Report Dear Sir, All unwanted materials removed from CO2 plot area. All high level openings are closed with… Continue reading Safety Comply Report