Typical floor Drawings Submission

calculate the variation from tender and revised drawing

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Typical floor Drawings Submission Dear Sir, With reference to the above mentioned subject and project, we would like to inform… Continue reading Typical floor Drawings Submission

Regarding the Handicapped Lift at Roof near pool deck

Lift

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject:  Regarding the Handicapped Lift at Roof near pool deck. Dear Sir, With reference to the above mentioned subject. We would… Continue reading Regarding the Handicapped Lift at Roof near pool deck

Regarding the Lift Program delivery execution

Critical Path

Ref: CC/IC/SP/18/863 Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject                   : Regarding the Lift Program delivery execution. Dear Sir, With reference to the above mentioned subject and project, we would… Continue reading Regarding the Lift Program delivery execution

Loading Diagram for Post Tensioning Slab

calculate the variation from tender and revised drawing

Date: xxx CC/AP/MG/26/15 To:                        M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:           Mr. xxx Project:                2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:               Loading Diagram for Post Tensioning Slab Dear Sir, With reference to the above mentioned subject, M/s xxx Emirates Pre-stressed… Continue reading Loading Diagram for Post Tensioning Slab

About Cash Advance Transportation Allowance

shake-up-sales-meeting

Date: xxx To:                        M/s. xxx Contracting L.L.C Dubai, UAE Kind Attn:           xxx Group HR Subject:               About Cash Advance Transportation Allowance Dear Sir/Ma’am,                With reference to the above mentioned subject, I, xxx, newly joined Civil Technical Secretary Staff in 2B + G + 14+ Lower Roof Hotels Building on Plot Noxxx at Al … Continue reading About Cash Advance Transportation Allowance

Request to confirm the location of lift indicators Door Opening/containment for BMS System, CCTV, Access panel and Dumbwaiter structural requirement

Lift

Date :xxx Ref: CC/swb/AP/RP-300116 To, M/s. xxx Consulting Architects and Engineers Dubai, U.A.E. Attn. : Mr. xxx Project         : Proposed 2B+G+M+13 Floors Hotel Building on plot no xxx, Al Barsha 1st, Dubai Client           : Mr xxx Consultant   : M/S xxx Consulting Architects and Engineers Subject       : Request to confirm the location of lift indicators Door Opening/containment for… Continue reading Request to confirm the location of lift indicators Door Opening/containment for BMS System, CCTV, Access panel and Dumbwaiter structural requirement

Replacement of PT Subcontractor Proposal instead of the approved one

PT WORKS

Date: xxx CC/AP/MG/25/15 To:                   M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:       Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:           Replacement of PT Subcontractor Proposal instead of the approved one Dear Sir,             With reference to the above mentioned… Continue reading Replacement of PT Subcontractor Proposal instead of the approved one

Your comments for the Trial Mix test report

Trail Mix Concrete

Date: xxx CC/CTM/ME/1/10/15 To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:           Mr. xxx Project:               2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:               Your comments for the Trial Mix test report dated on 27-10-15 and our submittal reference CC/AP/269/03/47A Dear Sir,               … Continue reading Your comments for the Trial Mix test report

Permission for Temporary Half Road Blocking while Concreting Loading and offloading

Road Block

Date: xxx CC/DM//1/16 To: Head of the RTA Department Dubai, UAE Subject:               Permission for Temporary Half Road Blocking while Concreting Loading and Un-Loading Dear Sir,                With reference to the above subject we are in RTA Road No 373-11th Street on Plot No 373-1297, this is ongoing construction project  as per attach drawing ,kindly… Continue reading Permission for Temporary Half Road Blocking while Concreting Loading and offloading

Regarding operation of service lift by your attend

Lift

Date: XXX CC/SCHINDLER/002 To                   :  M/s XXX Intl.Ltd Project            :  2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding operation of service lift by your attend Dear Mr. Mayur and Mr. Ramesh, With Reference to above we are hereby instructing you that we… Continue reading Regarding operation of service lift by your attend