Author name: Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Bituminous-Membrane-Waterproofing

Waterproofing Second Layer Checked by M/s xxx Contracting LLC

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Waterproofing Second Layer Checked by M/s xxx Contracting LLC Dear Sir,             With reference to the above subject, […]

Waterproofing Second Layer Checked by M/s xxx Contracting LLC Read Post »

delivery of Tiles and cheque copy.

Revised Drawing and your Document Transmittal Ref No. xxx dated xxx

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Revised Drawing and your Document Transmittal Ref No. xxx dated xxx Dear Sir,                With reference to the

Revised Drawing and your Document Transmittal Ref No. xxx dated xxx Read Post »

Bituminous-Membrane-Waterproofing

Surface preparation of  water proofing

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Surface preparation of  water proofing Dear Sir,                As per site visit on today evening Mr.xxx said that

Surface preparation of  water proofing Read Post »

Submission of the pile rebar cutting detail on West /Rear side

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Submission of the pile rebar cutting detail on West /Rear side Dear Sir,                With reference to the

Submission of the pile rebar cutting detail on West /Rear side Read Post »