Revised Drawing and your Document Transmittal Ref No. xxx dated xxx

delivery of Tiles and cheque copy.

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Revised Drawing and your Document Transmittal Ref No. xxx dated xxx Dear Sir,                With reference to the… Continue reading Revised Drawing and your Document Transmittal Ref No. xxx dated xxx

Regarding fine imposed by Dubai Municipality due to Pile Cutting

Compliance Visit Report

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Regarding fine imposed by Dubai Municipality due to Pile Cutting by xxx Shoring Contractor and Debris Removal Dear… Continue reading Regarding fine imposed by Dubai Municipality due to Pile Cutting

Surface preparation of  water proofing

Bituminous-Membrane-Waterproofing

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Surface preparation of  water proofing Dear Sir,                As per site visit on today evening Mr.xxx said that… Continue reading Surface preparation of  water proofing

Reason for the not attending the meeting in time

shake-up-sales-meeting

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Reason for the not attending the meeting in time Dear Sir, I’m extremely sorry that I was not… Continue reading Reason for the not attending the meeting in time

Submission of the pile rebar cutting detail on West /Rear side

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Submission of the pile rebar cutting detail on West /Rear side Dear Sir,                With reference to the… Continue reading Submission of the pile rebar cutting detail on West /Rear side

Submission of Tower Crane soft copy with the design and setting out plan

Tower Crane

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Submission of Tower Crane soft copy with the design and setting out plan Dear Sir, With reference to… Continue reading Submission of Tower Crane soft copy with the design and setting out plan

West Side Neighbor Shoring area and projection of the copping beam

Shoring Works

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             West Side Neighbor Shoring area and projection of the copping beam Dear Sir, With reference to the above… Continue reading West Side Neighbor Shoring area and projection of the copping beam

Shop Drawing for Drainage Manhole Excavation

Manhole-Excavation

Dr Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Shop Drawing for Drainage Manhole Excavation Dear Sir, With reference to the above , we are submitting… Continue reading Shop Drawing for Drainage Manhole Excavation

Status and update for office set up as on xxx

demobilizing

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Status and update for office set up as on xxx Dear Sir, With reference to the above mentioned… Continue reading Status and update for office set up as on xxx

Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the same as per DM instruction

Construction debris

Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:     Mr. xxx Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject:             Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the… Continue reading Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the same as per DM instruction