Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Revised Drawing and your Document Transmittal Ref No. xxx dated xxx Dear Sir, With reference to the… Continue reading Revised Drawing and your Document Transmittal Ref No. xxx dated xxx
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Regarding fine imposed by Dubai Municipality due to Pile Cutting
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Regarding fine imposed by Dubai Municipality due to Pile Cutting by xxx Shoring Contractor and Debris Removal Dear… Continue reading Regarding fine imposed by Dubai Municipality due to Pile Cutting
Surface preparation of water proofing
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Surface preparation of water proofing Dear Sir, As per site visit on today evening Mr.xxx said that… Continue reading Surface preparation of water proofing
Reason for the not attending the meeting in time
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Reason for the not attending the meeting in time Dear Sir, I’m extremely sorry that I was not… Continue reading Reason for the not attending the meeting in time
Submission of the pile rebar cutting detail on West /Rear side
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Submission of the pile rebar cutting detail on West /Rear side Dear Sir, With reference to the… Continue reading Submission of the pile rebar cutting detail on West /Rear side
Submission of Tower Crane soft copy with the design and setting out plan
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Submission of Tower Crane soft copy with the design and setting out plan Dear Sir, With reference to… Continue reading Submission of Tower Crane soft copy with the design and setting out plan
West Side Neighbor Shoring area and projection of the copping beam
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: West Side Neighbor Shoring area and projection of the copping beam Dear Sir, With reference to the above… Continue reading West Side Neighbor Shoring area and projection of the copping beam
Shop Drawing for Drainage Manhole Excavation
Dr Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Shop Drawing for Drainage Manhole Excavation Dear Sir, With reference to the above , we are submitting… Continue reading Shop Drawing for Drainage Manhole Excavation
Status and update for office set up as on xxx
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Status and update for office set up as on xxx Dear Sir, With reference to the above mentioned… Continue reading Status and update for office set up as on xxx
Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the same as per DM instruction
Date: xxx Ref. xxx To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai. Subject: Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the… Continue reading Cost Estimation for Removal of the Debris for S.S. xxx and required immediate permission for removal of the same as per DM instruction