Waterproofing Second Layer Checked by M/s xxx Contracting LLC

Waterproofing Second Layer Checked by M/s xxx Contracting LLC

Date: xxx

Ref. xxx

To:

M/s. xxx Consulting Architects and Engineers

Dubai, UAE

Kind Attn:     Mr. xxx

Project:          2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai.

Subject:             Waterproofing Second Layer Checked by M/s xxx Contracting LLC

Dear Sir,

            With reference to the above subject, kindly see the attached photos observed and marked by M/s. xxx during the inspection conducted prior to the inspection of Consultant.

          We marked various points in which you need to rectify. Attached were the photos for before and after the rectification.

          In connection for this the Consultant required the presence of the Henkel representative in site during the inspection for the 2nd layer of water proofing membrane before to start the fixing of protection board.

Regards,

For xxx Contracting L.L.C

xxx

Project Manager