METHOD STATEMENT FOR INSTALLATION AND TESTING OF FIRE SPRINKLER SYSTEM

Method Statement Title: Installation of Sprinkler Piping System

Method Statement Title: Installation of Sprinkler Piping System Scope The scope of this method statement is to describe the method of installation of sprinkler piping system in Burj Dubai – The Residences Project in accordance with the project specifications.             Note a.         Installation of stand pipes and fire hose reels is covered under a separate

Method Statement Title: Installation of Sprinkler Piping System Read Post »

3-tips-for-Fire-Pump

Method Statement Title: Installation of Fire Water Pumps

Method Statement Title: Installation of Fire Water Pumps Note             A separate method statement Ref. ETA/MS/P-015 will be submitted for Start-up & Commissioning of Fire Water Pumps. 4.0       Applicable Location                 4.1       West Tower – W2 Basement Floor. 5.0       Method 5.1       Receiving 5.1.1    When received at site, each pump, valves, air vent, pressure relief valve

Method Statement Title: Installation of Fire Water Pumps Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

Method Statement Title: Installation & Testing of Underground Drainage Piping

Method Statement Title: Installation & Testing of Underground Drainage Piping 1.0       Scope 1.1       This method statement details the method for installation and hydrostatic testing of underground drainage piping. 2.0       Material             2.1       UPVC Pipes to EN1401-1 (Formerly BS 4660) with push-fit grooved joints. 3.0       Applicable Location             East and West Podium – Basement level. 4.0      

Method Statement Title: Installation & Testing of Underground Drainage Piping Read Post »

CHECKLIST FOR INSTALLATION OF WATER BOOSTER PUMPS

Method Statement Title: Installation & Testing of Domestic Water Piping System

Method Statement Title: Installation & Testing of Domestic Water Piping System 1.0       Scope The scope of this method statement is to detail the method of installation and hydrostatic pressure testing of Domestic Water Piping System.             Note             The chlorination and disinfections of the system shall be covered under a separate method statement Ref. ETA/MS/P-016.

Method Statement Title: Installation & Testing of Domestic Water Piping System Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

Method Statement Title: Installation & Testing of Above Ground Drainage Piping

Method Statement Title: Installation & Testing of Above Ground Drainage Piping 1.0       Scope : Note  :  For the installation & testing of Above ground drainage piping concealed in columns & shear walls, refer to method statement Ref: ETA/BDR/TW1/CD/0095. 2.0       Material : b)   For 3” dia & above              –           Push fit jointing. 

Method Statement Title: Installation & Testing of Above Ground Drainage Piping Read Post »

Butterfly Valve Installation and Maintenance Procedure

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System 1.0     Scope :             To describe the method of flushing, Disinfecting and chlorination of domestic water System as per specification Section 15400 Clause 3.07. 2.0     Material : 3.0     Applicable locations and Description : 4.0     Method :  Refer enclosed details.

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System Read Post »