November 2022

Engineering Submittals

Undertaking Letter for Shoring works

Ref. No.: xxx/1021/DM/2022/02 Date: November 11, xxx To:       xxx Municipality Department of Building and Development Dubai, UAE Project: Proposed Warehouses On Plot No. xxx at Al xxx, Dubai, UAE, for Heirs of Mr. xxx Client: xxx Subject: Undertaking Letter for Shoring works Dear Sir, We, xxx Building Contracting LLC, Consultant of the above-mentioned project

Undertaking Letter for Shoring works Read Post »

Re-route your Dewatering Line

SUBCONTRACT AGREEMENT FOR DEWATERING WORKS

SUBCONTRACT AGREEMENT FOR DEWATERING WORKS AGREEMENT NO        : XXX-P1016-SCA-DW-2021-02 AGREEMENT DATE  : 17th November XXX PROJECT                      : Proposed Development Of Residential Villa (B+G+1+R) On Plot No. XXX, at XXX, Dubai, U.A.E. CLIENT                            :  MR. XXX CONSULTANT             : M/s. XXX CONSULTANTS This Subcontract Agreement is made effective on the date 17th November XXX BETWEEN M/s. XXX

SUBCONTRACT AGREEMENT FOR DEWATERING WORKS Read Post »

Reply - Notice of Delay

Re: Dewatering Works Delay Penalty

REF. No.: xxx/1016/SS-DOC/2022/03 Date: 1 November xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: xxx, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Re: Dewatering Works Delay Penalty Dear Mr. xxx, This is further to your letter ref. xxx/LR/JJ/J-8218-03/2022 dated 1st

Re: Dewatering Works Delay Penalty Read Post »

Undertaking Letter

Reply – response of Interim Extension of Time Claim (EOT-01)

Ref.:                     XXX/1020/AA/XXX/05 Date:                   October 27, XXX To:                       M/s. XXXX ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. XXXX, Sobha Ivory 2, Business Bay P.O. Box XXX, Dubai, UAE Attention:         Engr. XXXX – Resident Engineer Project:              Proposed G+1 & Service Block (R-9) Villa, On Plot No. xxxx at Al Barari – Dubai, UAE. Client:                Mr.

Reply – response of Interim Extension of Time Claim (EOT-01) Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING TABLE OF CONTENTS 1.1. The objective of this method statement is to establish the necessary guidelines for the installation of underground drainage in accordance with the contract requirements. This method Statement shall ensure that the installation of underground drainage is executed safely and in accordance with the contract requirements.

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING Read Post »