Undertaking letter for temporary scaffold for swimming pool deck slab before concrete.

Undertaking letter for temporary scaffold for swimming pool deck slab before concrete.

Ref: xxx

Date: xxx

To:

P.O Box: xxx

Tel: xxx, Fax: xxx

Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City

Client                       : M/s xxx Properties Ltd

Consultant             : M/s xxx Engineering Consultant.

Subject: Undertaking letter for temporary scaffold for swimming pool deck slab before concrete.

Dear Sir

Referring to the above, please note that the works for the swimming pool deck slab erected for slab and it is inspected and safe to carry load for concrete as live load, height of is very low and safe.

This certificate is given on the basis of materials erected based on our design drawings submitted approved by your office.

Area (as per drawings): Swimming pool deck.

Height                            : 1.5 m (floor height)

Slab Thickness               : 150 mm thick (solid slab)

For xxx Contracting LLC

xxx

General Manager

Leave a Reply

Your email address will not be published. Required fields are marked *